Browse
Search
Agenda - 11-23-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 11-23-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 2:07:24 PM
Creation date
10/4/2016 4:21:00 PM
Metadata
Fields
Template:
BOCC
Date
11/23/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
024 <br /> ANALYSIS AND EVALUATION : A commercial use is present at the <br /> intersection . No environmental constraints hinder small - <br /> scale commercial development in the area. There is some <br /> residential development in the area of this node and <br /> additional commercial development could be potentially <br /> disruptive. The area west of Highway 86 is in the Water <br /> ,Quality Critical Area of the Upper Eno watershed . <br /> REFERENCE: CG-5, Walnut Grove <br /> LOCATION : Walnut Grove Church Road (SR 1 ')01 ) , Saw Mill <br /> Road (SR 1545) and Little River Church Road <br /> (SR 1543) <br /> PLAN CATEGORY: Rural Neighborhood <br /> ANALYSIS AND EVALUATION: This node is located at the <br /> intersection of three collector roads. Moderate <br /> environmental constraints in the form, of flood prone areas <br /> exist, but should not hinder ' small -scale commercial <br /> development at this node. A commercial use exists in the <br /> area of this node. <br /> REFERENCE : CG-6, Prospect Hill <br /> LOCATION: NC 49 and NC 86 <br /> PLAN CATEGORY: Rural Industrial <br /> ANALYSIS AND EVALUATION: This node is located at the <br /> intersection of two arterials. It, therefore, has good <br /> access for rural commercial as well as rural industrial uses. <br /> No environmental constraints hinder small -scale rural <br /> industrial development at the node. The absence of municipal <br /> water and sewer services would limit the scale of future <br /> rural industrial development in the node area . Minimal <br /> disruption of residential uses would result from such <br /> development. <br /> 3 .6-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.