Browse
Search
Agenda - 11-23-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 11-23-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 2:07:24 PM
Creation date
10/4/2016 4:21:00 PM
Metadata
Fields
Template:
BOCC
Date
11/23/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
169 <br /> 4 <br /> all proposed _ingress and egress locations, all <br /> internal roadway widths _ and r i gilts-of-way, <br /> Darking_ conditions, traffic channellzations, and <br /> any traffic signals or other Intersection <br /> control_ devices at alL intersections within the <br /> site . <br /> The report shall describe the entice external <br /> roadway system within the study area. Major <br /> .intersections In the study area shall be <br /> identified and sketched . All existing and <br /> proposed public transportation services arid <br /> facilities within one-mile of the site shall <br /> - • . - 4 • , <br /> improvements, including _proposed construction <br /> and traffic signalization, shall be noted . This <br /> information shell be obtained from North <br /> Carolina 's Transportation Improvement Program. <br /> Any proposed roadway improvements due to <br /> proposed surrounding deYelopments shall also be <br /> noted., <br /> c) EXISTING TRAFFIC CONDITIONS <br /> Existing traffic conditions shall be measured <br /> and documented for all roadways and <br /> intersections in the study area, Existing <br /> traffic volumes for average daily traffic, peak <br /> highway hour ( s) traffics and peals development <br /> generated hQur( s) traffic shall be recorded ., <br /> Manual traffic counts et ma_jpr intersections in <br /> the study area shall _be copdyted, encompassing <br /> the peak highway and development-generated <br /> hour (s), and documentation shall be included in <br /> the report. A volume/capacity analysis based <br /> upon existing volumes shall be performed during <br /> the peek highway bQU,r( s) end the peak <br /> development-generated hQur(s) for all roadways <br /> aad major intersections in the study area. <br /> Levels of service shall_ be determined for each <br /> locations <br /> This analysis will determine the adeouacy of the <br /> existing roadway system to serve the current <br /> traffic demand . Roadways end/or intersections <br /> experiencing levels of service E or F shall be <br /> noted as congestion locations . <br /> d ) TRANSPORTATION _IMPACT OF THE DEVELOPMENT <br /> Estimation of vehicular trips to result from the <br /> proposal shall be completed for the average <br /> daily peak highway houris) and peak deve) opmerit <br /> generated houris ) . Vehicular trip generation <br />
The URL can be used to link to this page
Your browser does not support the video tag.