Browse
Search
Agenda - 11-23-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 11-23-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 2:07:24 PM
Creation date
10/4/2016 4:21:00 PM
Metadata
Fields
Template:
BOCC
Date
11/23/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 , 128 �2 <br /> d SYSTEMS DESIGN <br /> CONSIDERATIONS <br /> ✓ where as gravity lines must be <br /> Once the design engineer has made <br /> a decision to design a pressure aligned in a continuous down- <br /> • sewer system, he must then decide ward slope. Deep cuts for gravity <br /> on design parameters that would lines become quite expensive, <br /> effect the operation of the system, especially where rock and high <br /> i The most important considerations water tables are present. <br /> C. Narrow and Shallow Trenches - <br /> would be design flow, friction loss. <br /> • pump type, scouring velocity and Pressure sewer service lines and <br /> air venting. force mains can be easily installed <br /> inr narrow trenches just below the <br /> • <br /> frost line. In the case of the <br /> Friction losses are determined by Sunbelt states, the pipe has to be <br /> • the Hazin-Williams method with laid deep enough for mechanical <br /> appropriate C factor. A C factor of protection. <br /> 4 150 is used most frequently in STEP D. Minimum Equipment & Labor • <br /> pressure sewer designs. A scouring , Pressure sewers can be installed <br /> velocity of 2 to 5 f/sec. is normally • with a trencher and backhoe. The <br /> II recommended for the service lines force mains usually are installed <br /> and force mains. However, since a in the right-of-ways along the road. <br /> 4 high percentage of solids and grease In comparison, gravity sewer in- <br /> is left in the septic tank, some en- stallations require large power <br /> gineers use a minimum scouring • shovels and it may be necessary <br /> to install the mains in the streets. <br /> velocity of 1 f/sec. Air venting is Labor and equipment require- <br /> important to prevent binding at the ments to handle large diameter <br /> high points of the pressure mains. gravity sewer pipe in comparison . <br /> There is a limit to how many homes to small PVC pipe can be substan- <br /> tially higher. <br /> can be paralleled together in one E. Road and Bridge Crossings - <br /> 4 system depending on pump head Small diameter pressure sewer <br /> capabilities and the TDH require- service lines and pressure mains <br /> • ments of the system. About 500 can be bored under roads with <br /> homes would be the upper limit with minimum difficulty (assuming no <br /> relatively flat topography. rock) since precise slope and align- <br /> ment are not critical. Small force <br /> ADVANTAGES OF EFFLUENT mains can be installed across <br /> � bridges without the use of pump <br /> PRESSURE SEWERS • stations. If freezing is of concern. <br /> VERSUS GRAVITY the small pipe can be insulated <br /> A.Small Diameter Plastic Pipe-One F. Reduction or Elimination of Pump <br /> 4 of the advantages of pressure Stations and Manholes - Another <br /> sewers over gravity systems is the advantage of pressure sewers is <br /> ability to use small diameter the ability to eliminate manholes <br /> plastic pipe for the service lines and pumping stations within limit- <br /> and force mains. In pressure ations of the grinder pumps head <br /> 4 systems,the service line is normal- capabilities. Manholes are not <br /> ly 1-14" I.D. and 1-1/2" to 6" I.D. required with pressure sewers. <br /> 4 • for force mains. This is in.com- _ However, a valve box is recom- <br /> parison to gravity service lines of . mended about every 1000 feet or <br /> 4" and 6"and gravity mains up to ' major change in direction. If inter- <br /> 4 14" and 16" for a comparable mediate pump stations are re- <br /> number of house connections. quired in a pressure sewer system, <br /> 4 Consequently, there is a major they are usually much smaller <br /> cost advantage in the piping col- pumps and wetwells due to lower <br /> lection system for pressure sewers flow requirements. <br /> 4 versus gravity. G.Infiltration & Inflow - One of the <br /> B. Pipe Alignment - Based on the major problems with gravity sewers <br /> 4 pumping capability of the pump, is the problem of heavy infiltration <br /> the service lines and force mains . due to broken pipe and leaky <br /> can run up and downhill following joints. In the flooding seasons this <br /> 4 the contour (within shutoff head can cause problems at the treat- <br /> limitations) of the topography <br /> 4 __ _ _ _ __ 4 <br /> ., CRAIG B.MORGAN AND ASSOCIATES,P.A.• de <br /> a <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.