Browse
Search
Agenda - 11-02-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 11-02-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 11:41:41 AM
Creation date
10/4/2016 3:42:39 PM
Metadata
Fields
Template:
BOCC
Date
11/2/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> 013 <br /> LANZOU.S.70 At Rock Creek Dairy Rd. <br /> P.O.Box 22024 <br /> CONSTRUCTION Greensboro,NC 27420 <br /> COMPANY <br /> 919-271-3267 or <br /> (919)449-7555 <br /> October 13, 1987 <br /> Hazen & Sawyer, P. C. <br /> P. Q. Box 30428 <br /> Raleigh, N. C. 27622 <br /> Attn: Kevin Carter <br /> Re : Efland Cheeks Township <br /> Sanitary Sewer Facilities <br /> Orange County, N.C. <br /> Dear Kevin, <br /> In reference tc the line 1B bore across Highway 70 , the following <br /> is our proposal to complete the bore, based on the new soil borings <br /> provided by S&ME, Inc. per their letter to you dated October 2 , 1987 . <br /> Our maximum "not to exceed" lump sum price is $12 , 550 to complete <br /> the final (35) L.F. of bore . Further, we offer to complete this bore at <br /> the following unit prices which in all probability will be less than <br /> the above noted price but certainly not exceed $12 , 550. 00 . <br /> 1 . Remobilize and excavate bore pit for subcontractor= $1 , 000 . 00 <br /> 2 . Bore 36" casing pipe in "Good" earth @ $176 . 00/L. F. <br /> 3. Jack and hand mine 36" casing pipe in rock @ $330 . 00/L.F. <br /> 4 . Changeover charge from boring in "good" earth to hand mining rock <br /> @ $550 . 00. <br /> Itr_eeds to be understood that the subcontractor will begin his operation <br /> by boring until the weathered rock is encountered. At that point and <br /> at his discretion he will change over once and complete the bore by hand <br /> mining the rock until he ties into the existing 18" casing pipe . <br /> We trust you will find the proposal acceptable and look forward <br /> to your early response since time is of the essence on this project. <br /> We further request an appropriate time extension to our contract for the <br /> delay in completing this bore. <br /> Should you have any questions , or require any additional information, <br /> please feel free to call . <br /> -m y truly yo <br /> - 662 <br /> Angelo andes , P.E. <br /> CC: File <br /> OCT 13 1S3-7 <br /> 28135 Groesbeck Hwy 1900 NW 44th St. <br /> Roseville,MI 48066 <br /> (313)775-7566 Pompano Beach.FL.33064 <br /> 13051 979-0802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.