Browse
Search
Agenda - 11-02-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 11-02-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 11:41:41 AM
Creation date
10/4/2016 3:42:39 PM
Metadata
Fields
Template:
BOCC
Date
11/2/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAZEN AND SAWYER P•C• <br /> CONSULTING ENGINEERS <br /> October 27, 1987 <br /> Mr. William T. Laws <br /> Assistant County Manager <br /> Orange County, North Carolina <br /> 106 East Margaret Lane <br /> Hillsborough, NC 27278 <br /> Re: Change Order No. 1 <br /> Efland—Cheeks Township <br /> Sanitary Sewer Facilities <br /> H&S Job No. 3600 <br /> Dear Mr. Laws: <br /> Attached please find six (6) copies of Change Order No. 1 . As you <br /> will recall , at our expense, we had S&ME make additional soil test borings <br /> at the location of the bored casing under US 70 along line 1B, where rock <br /> was encountered during the installation. After reviewing the additional <br /> subsurface data from S&ME (see attached) , it is our recommendation that <br /> the County approve Change Order No. 1 , adjusting the cost for the <br /> Contractor to complete the aforementioned installation. <br /> The Change Order has been executed by Hazen and Sawyer and Lanzo <br /> Construction Company. The Contractor has also agreed that it will be at <br /> the discretion of the Engineer and not the sub—contractor as to when the <br /> changeover from soil boring to hand rock excavation will be initiated, as <br /> stipulated in Attachment A. The maximum cost of $12,550 found in <br /> Attachment A is reduced by $2,079.00 for the unit price deduction of the <br /> 18—inch casing pipe not installed due to the rock. This leaves a balance <br /> of $10,471 .00 as indicated in Change Order No. 1 . We feel the probable <br /> cost of the additional work will be less than the $10,471 .00 unless <br /> additional unforeseen rock is encountered with the new procedure, but in <br /> no event will the cost exceed $10,471 .00. Actual costs will be based on <br /> the final adjusted quantity of work performed. <br /> Please advise if you have any questions. <br /> Very truly yours, <br /> HA� ' D SAWYE , P <br /> F. arter, P.E. <br /> Pr, e Engineer <br /> KFC/er <br /> Enclosure <br /> 4300 GLENWOOD AVENUE - P-0.BOX 30428 • RALEIGH,NORTH CAROLINA 27622 • (919)782-8333 <br /> RALEIGH,NC - CHARLOTTE,NC HOLLYWOOD,FL - NEW YORK,NY <br />
The URL can be used to link to this page
Your browser does not support the video tag.