3 <br /> 136 _ approved. The letter also notified the <br /> applicant of the need to construct right and <br /> left turns on Mt. Sinai Road. <br /> Augus.t 25, 19$7 : NCDOT notified the Planning <br /> Department that it no longer recommended a <br /> left turn lane on Mt. Sinai Road. It cited <br /> lack of a dedicated right-of-way and <br /> insufficient road frontage for Piney Mountain <br /> subdivision on Mt. Sinai Road as reasons for <br /> the change in recommendation. The following <br /> were instead recommended : <br /> 1 . One hundred ( 100) foot right turn taper <br /> on SR 1718. <br /> 2. Increase dedicated right-of-way to forty <br /> (40 ) feet from centerline for future road <br /> expansion. <br /> 3. Increase driveway width to thirty-six <br /> (36) feet to accommodate three (3) twelve <br /> ( 12) foot lanes. <br /> October 5_, 1987 : NCDOT notified the Planning <br /> Department that the thirty-six foot wide <br /> driveway into Piney Mountain subdivision was <br /> no longer required. The applicant had <br /> submitted a revised subdivision entrance <br /> eliminating the divided driveway. Without the <br /> divided driveway, the thirty-six foot width <br /> was no longer needed. <br /> Dctober 5, 19871 NCDOT notified the project <br /> engineer that construction plans for Phase I <br /> of Piney Mountain were approved with two <br /> revisions: <br /> 1 . Increase pipe size at station 3+45+ to <br /> thirty (30 ) inches. <br /> 2. Provide a dedicated 10 'x70 ' sight <br /> distance triangle at each intersection <br /> within the development. <br /> The original Planning Staff recommendation was <br /> based on the July 16, 1987 NCDOT letter. The <br /> Planning Board, at its July 20 meeting, <br /> revised that recommendation by requiring con- <br /> struction of the left turn lane on Mt. Sinai <br /> Road as part of Phase One. The recommendation <br /> was approved by the Board of Commissioners at <br /> its August 18 meeting. The letter from NCDOT <br /> changing its recommendation with regards to <br /> the left turn lane was received nine days <br /> later. <br /> The entrance plan that accompanied the NCDOT <br />