Orange County NC Website
/d rev `0 7 <br /> dY '1 6 <br /> w <br /> 133 <br /> t' iL*j <br /> STATE OF NORTH CAROLINA <br /> DEPARTMENT OF TRANSPORTATION <br /> Graham, NC 27253-0766 <br /> JAMES G.MARTIN October 5, 19&7 DIVISION OF HIGHWAYS <br /> GOVERNOR <br /> JAMES E.HARRINGTON GEORGE E.WELLS,P.E. <br /> SECRETARY STATE HIGHWAY ADMINISTRATOR <br /> Orange County <br /> Mr. Tony Withers <br /> Withers and Ravenel, P. A. <br /> 1149 Executive Circle <br /> Cary, NC 27511 <br /> Subject: Piney Mountain Subdivision - <br /> Phase I Off SR 1718 <br /> Dear Mr. Withers: <br /> . Attached, please find- a copy of the approved construction plans. <br /> Approval is given subject to the revisions shown in red on the attached plans, <br /> which are as follows: <br /> 1. Increase pipe size at station 3+45* to thirty (30)- <br /> inches. <br /> 2. Provide a dedicated 10' x 70' sight distance triangle <br /> at each intersection within the development. <br /> Please be. advised this approval pertains to Phase One only and should <br /> - not be construed as -final approval for any part of Phase Two. <br /> It will be necessary to contact Mr. Pat Ivey to set up a schedule <br /> for subgrade, stone and asphalt inspection. Density and moisture content tests <br /> -- may be requested if conditions warrant such tests as determined by the inspector. <br /> The developer shall be responsible for obtaining such tests. <br /> If you have any questions, .do not hesitate to contact this office. <br /> = Yours very truly, <br /> J M. Mills, P. E. <br /> JMM/SPI:jbh .__. - DISTRICT ENGINEER <br /> Atte. - . <br /> cc: Ms.. Emily Crudup 4 <br /> Mr. Mark -O'Neal - <br />