Browse
Search
Agenda - 11-02-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 11-02-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 11:41:41 AM
Creation date
10/4/2016 3:42:39 PM
Metadata
Fields
Template:
BOCC
Date
11/2/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M 1::,\ <br /> o Dedication or payment- in- lieu <br /> 111 <br /> o - Bond referendum <br /> o Impact fees <br /> o User charges <br /> c . Institutional strategies <br /> o Multi-jurisdictional cooperation <br /> o Staffing for monitoring/maintenance <br /> The strategies identified above are only representative <br /> of the many approaches possible. The Proposer is <br /> encouraged to identify in the Proposal additional <br /> strategies which are worthy of consideration . <br /> 7 . Present a program for the implementation of the open <br /> space plan, by plan element <br /> a . Agricultural preservation <br /> b . Region forming open space <br /> c. Parks and recreation facilities <br /> d . Water resources <br /> e. Rare, endangered and unique sites <br /> f . Designed open space <br /> g. Committed open space <br /> h . Conservation areas <br /> Qualifications and Experience of Proposer <br /> Each submittal shall include a statement concerning the <br /> Proposer ' s qualifications, experience and expertise as it <br /> pertains to the proposed work. The Proposal shall also <br /> address the competence of the Proposer from the standpoint of <br /> number and capability of personnel which will be devoted to <br /> the project . The Proposal must state the name( s ) of the <br /> person (s ) who will be assigned to the project, along with <br /> complete information on the background and qualifications of <br /> such designated person (s ) to perform the work . The Proposal <br /> must designate the person who will serve as Project Manager <br /> and be most prominent and responsible for on-site work as <br /> well as the person (s ) who will be responsible for the Final <br /> Report. <br /> The Proposal must include descriptions of comprehensive <br /> studies previously completed by the Proposer which involved <br /> services similar to those required by the County. <br /> Information concerning the costs to complete each of the <br /> studies and the size of the jurisdiction for which the <br />
The URL can be used to link to this page
Your browser does not support the video tag.