Orange County NC Website
' 060 <br /> Tran '3ortatiOfl / <br /> Tri1ic 1m?ac Ana1y8i8 •The Meadowlands site is served by the 1-85/NC 86 interchange and the US 70A/NC 86 <br /> intersection. The site fronts on US 70A and 1-85. Access to the property is direct to US 70A • • <br /> and a connector to NC 86 is under consideration.Trip generation, distribution, and <br /> assignment analyses were completed using the proposed land uses and the illustrative site <br /> plan. <br /> The Meadowlands will have 2,095 trips to and away from the site on a typical day.The <br /> afternoon peak hour (4:45 PM to 5:45 PM) will have 115 trips to the site and 435 trips away <br /> from the site on an average day. <br /> 1984 Average Daily Traffic counts were obtained from the North Carolina Department of <br /> Transportation. June 1985 PM peak hour turning movement counts were undertaken at the <br /> intersection of US 70A and NC 86. In addition, the year 2002 Average Daily Traffic estimates <br /> were obtained from the NCDOT. <br /> PM peak hour traffic and average daily traffic to and from the project were assigned to the <br /> highway network. <br /> A capacity analysis of the intersection of US 70A and NC 86 was undertaken for both <br /> existing and future conditions. Under existing conditions, all legs of this intersection operate <br /> at a high level of service in the afternoon peak hour except the south approach, which <br /> •operates at a moderate level of traffic flow. With full development of the project, <br /> this <br /> intersection will operate at level of service A under signalized conditions. Given full <br /> development without signalization, the south approach will operate.at a level of service F in <br /> the afternoon peak hour. Future traffic growth (as indicated by the year 2002 NCDOT traffic <br /> projections), combined with the traffic from The Meadowlands,will require stabilization of this <br /> intersection. <br /> The added Average Daily Traffic (ADT) to each link of the highway network serving this <br /> project is shown.The link of NC 86 between US 70A and 1-85 will require widening to <br /> accommodate lett turn movements along this segment of roadway when The Meadowlands is • <br /> fully developed and the future projected ADT volumes occur. <br /> When the project is fifty.percent developed, signalization will be required at the US 70A/NC <br /> 86 intersection to ensure a high level of traffic service. The signalization of this intersection <br /> might be delayed if the proposed additional connection between The Meadowlands and <br /> •NC 86 is provided. <br /> It a connection from the site to NC 86 is provided, it should be a three-lane facility allowing <br /> for a lett turn lane at its intersection with NC 86. A lett turn lane should also be provided•off of <br /> NC 86. ,..Aileado`wiand5 <br /> 20 <br />