Orange County NC Website
172 <br /> MEMORANDUM <br /> PD-3-87 OCCONEECHEE POINT - PUBLIC WATER & SEWER AVAILABILITY <br /> AUGUST 18, ..1987 <br /> PAGE 2 <br /> north under the Southern Railroad right-of-way onto the <br /> parcel upon which Occoneechee Point is proposed. Service to <br /> Occoneechee Point would be provided by extending this line to <br /> the project site . <br /> No material has been submitted with the application that <br /> details the Town of Hillsborough ' s capacity to provide water <br /> and sewer service to Occoneechee Point. Other documents, <br /> specifically the "Sewer System Feasibility Study for the <br /> Central Orange Study Area" prepared by C.E . Maguire, Inc. , <br /> May 1985 and the evaluation by Finkbeiner, Pettis, & Strout, <br /> January 1987, indicate that water is available in adequate <br /> quantities and that there was sufficient capacity in the <br /> Wildwood pump station to serve Occoneechee Point. <br /> Finkbeiner, Pettis, & Strout indicate that when it was <br /> designed capacity was included in the Wildwood pump station <br /> for a motel on the Occoneechee Point site . Information from <br /> Finkbeiner, Pettis, & Strout also indicate that the Wilmore <br /> pump station is not a capacity constraint to sewer service <br /> from the Wildwood pump station . This is documented by the <br /> attached memo dated August 14, 1987 . <br /> As a result of this evaluation, Staff recommends the <br /> following: <br /> 1 . the applicant for Occoneechee Point obtain from the <br /> Town of Hillsborough before plan approval state- <br /> ments that it has the capacity to provide water and <br /> sewer service to the project and what conditions <br /> must be met to extend service to the project; and <br /> 2. that detailed water and sewer plans be submitted to <br /> the State for approval prior to the initiation of <br /> construction activity. <br />