Browse
Search
Agenda - 08-24-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 08-24-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 8:31:32 AM
Creation date
10/4/2016 12:11:06 PM
Metadata
Fields
Template:
BOCC
Date
8/24/1987
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY PLANNING DEPARTMENT 17 j <br /> 306F REVERE ROAD <br /> HILLSBOROUGH, NORTH CAROLINA 27278 <br /> M E M O R A N D U M <br /> TO: ORANGE COUNTY PLANNING BOARD <br /> FROM: GREG SZYMIK, PLANNER III <br /> SUBJECT: PD-3-87 OCCONEECHEE POINT - PUBLIC WATER 8 SEWER <br /> AVAILABILITY <br /> DATE : AUGUST 18, 1987 <br /> The application for this Planned Development indicates <br /> that water and sanitary sewer service will be provided by <br /> extensions of the Town of Hillsborough facilities. In <br /> support of this, the applicant has submitted a copy of a <br /> recorded Water/Sewer Extension Easement/ Agreement. This <br /> agreement between the Town of Hillsborough and Wildwood <br /> Corporation, the Planned Development applicant, grants to <br /> Wildwood Corporation permission to connect to Town water and <br /> sewer lines to provide service to the Planned Development <br /> site . <br /> This agreement grants access to public water and sewer <br /> for the Occoneechee Point planned development, but it does <br /> not establish the Town ' s capacity to provide service and it <br /> does not specify under what conditions service can be <br /> extended. <br /> Staff evaluation of existing water and sewer faciliti⬠s <br /> indicates that extension to both are possible . An existing <br /> 12" water line is on the southern boundary of the parcel upon <br /> which Occoneechee Point is proposed. Extension to Occonee- <br /> chee Point would consist of tapping the 12" line with a <br /> connection to the project. The planned development indicates <br /> that this extension will be an 8" line . Service will be <br /> provided by constructing a gravity line for the project to <br /> the Wildwood pump station . The project engineer has indi- <br /> cated that during construction of the Wildwood pump station a <br /> gravity line stub-out was constructed from the pump station <br />
The URL can be used to link to this page
Your browser does not support the video tag.