Browse
Search
Agenda - 08-24-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 08-24-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 8:31:32 AM
Creation date
10/4/2016 12:11:06 PM
Metadata
Fields
Template:
BOCC
Date
8/24/1987
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( 011 <br /> O R A N G E C O U N T Y <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date _Aug>lat_ZiL_12 Z_ <br /> Action Agenda <br /> Item i a. <br /> SUBJECT: LUP-1 -87 CHANDLER CONCRETE COMPANY - LAND USE PLAN AMENDMENT <br /> DEPARTMENT: PLANNING PUBLIC HEARING _ .___Yes ___ No <br /> ATTACHMENT(S ) : INFORMATION CONTACT: Gene Bell <br /> Application Materials <br /> Copy of "Procedures for Amending <br /> the Land Use Plan" <br />_ Locational Criteria <br /> Memo to-Marvin Collins <br /> Town of Hillsborough 8/10/87 Comments <br /> TELEPHONE NUMBERS: <br /> Hillsborough - 732-8181 <br /> Durham - 688-7331 <br /> Mebane - 227-2031 <br /> Chapel Hill - 968-4501 <br /> PURPOSE : To receive citizen comment on a request by Chandler Concrete <br /> Company for a secondary Land Use Plan amendment. <br /> BACKGROUND: On October 10, 1985, Chandler Concrete Company was granted a <br /> secondary Land Use Plan amendment, Planned Development <br /> rezoning and Class A Special Use Permit for 1 .41 acres of <br /> land on N. C. Highway 10. The request was prompted by State <br /> mandated requirements to contain runoff from the existing <br /> concrete plant. <br /> An adjoining property owner subsequently challenged Orange <br /> County ' s approval in court. On December 12, 1986, the court <br /> ruled that the Special Use Permit was invalid since the <br /> applicant did not meet the required two-acre minimum lot <br /> size standard, and since evidence had not been presented to <br /> indicate the project would maintain the value of existing <br /> properties in the area. The affect of the court ruling was <br /> to place Chandler Concrete Company in violation of the <br /> Orange County Zoning Ordinance. Copies of County Commis- <br /> sioners and . Planning Board minutes dealing with previous <br /> deliberations on this property are contained as a separate <br /> enclosure. <br /> To correct its nonconforming status, Chandler Concrete is <br /> requesting that the Ten-Year Transition Area and Commercial -- <br /> Industrial Activity Node be expanded by an additional 0. 59 <br /> acres. Combined with the 1 .41 acres currently in the same <br /> designation , the two-acre lot size requirement could be met. <br />
The URL can be used to link to this page
Your browser does not support the video tag.