Orange County NC Website
-2- <br /> 004 <br /> ORANGE COUNTY <br /> PROPOSED 1987-1988 SECONDARY <br /> ROAD IMPROVEMENT PROGRAM <br /> Map Priority SR Esta. ated <br /> No. No. No. Name and Description Length Cost <br /> Paving Unpaved Roads <br /> 7. 2 1130 Ode Turner Road - From SR 1006 to SR 1129 1 .60 $ 10,000.00 <br /> Grade, Drain, Base, and Pave <br /> (Complete Funding) <br /> 8 4 1335 1enion Road - From NC 86 to SR 1332 1.80 227,700.00 <br /> Grade, Drain, Base, and Pave <br /> 9 6 1137 Bushy Cook Road - From SR 1144 to SR 1114 2.30 58,000.00 <br /> Grade, Drain., Base, and Pave <br /> (Partial. Funding) <br /> 10 1794 Timberly Drive - From SR 1734 to End of 0.60 31,910.00 <br /> Maintenance <br /> (P. 0. P. Paving) <br /> 11 1881 Moriah Hill Road - From SR 1794 to End of 0.20 10,400.00 <br /> Maintenance <br /> (.. O. P. Paving) <br /> Contingency to be Used for Minor Safety Improvements 44,268.00 <br /> Overruns, Additions to System-, Paving Rural Fire <br /> Department Drive, and Property Owner Participation. <br /> Note: If right of way is not available on the above <br /> unpaved roads, the funds will be programmed <br /> on other roads in the order of priority or <br /> applied on property owner participation paving. <br />