Browse
Search
Agenda - 10-10-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 10-10-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 2:33:10 PM
Creation date
10/4/2016 8:58:02 AM
Metadata
Fields
Template:
BOCC
Date
10/10/1988
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
023 <br /> 11 <br /> a. The project is located in Urban and Transition <br /> Areas as designated in the Land Use Element of <br /> the Comprehensive Plan; <br /> b. Service to the project is available through a <br /> water and/or sewer line extended to address a <br /> public safety and/or essential public service <br /> purpose and hardships solely the result of the <br /> inability to use the land proposed to be <br /> served by said services; i.e. , if the soil at <br /> a site is not suitable for individual on-site <br /> or alternative wastewater treatment systems; <br /> or <br /> c. The project is an approved master-planned <br /> development for residential purposes <br /> consisting of at least 500 acres or dwelling <br /> units in which the existing zoning of the site <br /> is retained and which qualifies for water <br /> and/or sewer service through an approved <br /> system of density bonuses established for the <br /> purpose of achieving affordable housing, <br /> energy efficiency, recreation/open space, and <br /> environmental protection goals. <br /> "Development project" refers to any residence, <br /> place of business or place of assembly, and any <br /> major or minor subdivision, special use or planned <br /> development which requires the approval of Orange <br /> County through administration and enforcement of <br /> the N.C. State Building Code or its Zoning and <br /> Subdivision Regulations. <br /> 4. Extension of public or private water and/or sewer <br /> Services outside Urban and Transition Areas adopted <br /> as part of the Land Use Element of the <br /> Comprehensive Plan will not be funded by Orange <br /> County. <br /> Draft: 7-31-87 <br /> Revisions: 8-26-87 <br /> 9-2-87 <br /> 11-16-87 <br /> 11-24-87 <br /> 9-17-88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.