Browse
Search
Agenda - 05-17-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 05-17-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 10:08:45 AM
Creation date
10/3/2016 4:34:55 PM
Metadata
Fields
Template:
BOCC
Date
5/17/1988
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> 023 HHANANAwR, Pc• <br /> CONSULTING ENGINEERS <br /> May 2, 1988 <br /> Mr. John M. Link, Jr. <br /> County Manager <br /> County of Orange <br /> P.O. Box 8181 <br /> Hillsborough, NC 27278 <br /> Dear Mr. Link: <br /> Hazen and Sawyer, P.C. is pleased to offer this proposal <br /> for a follow-up investigation of new issues raised relative to <br /> development of an additional water supply in Orange County. <br /> Since publication of our report on the water supply last <br /> November, it is our understanding that a specific proposal has <br /> been formulated for construction of a new dam on Seven-Mile <br /> Creek. The dam would be constructed of roller compacted <br /> concrete and the design would provide for a future expansion of <br /> the facility. The proposal contemplates that the County would <br /> acquire the property required for the project and that the Town <br /> of Hillsborough would finance construction of the dam <br /> improvements. A conceptual plan has also been developed for <br /> recovery of the necessary revenue to operate such a system. <br /> It is our understanding that the County desires to have <br /> Hazen and Sawyer review the specifics of this proposal and <br /> comment on the technical and financial merits of the project. <br /> To accomplish this objective, we have proposed to undertake the <br /> following tasks. <br /> 1) We will make a general review of the technical <br /> aspects of the proposal as developed by the Town of <br /> Hillsborough. We will make a special effort to <br /> verify the estimated construction cost of the roller <br /> compacted concrete dam. We will also review and <br /> verify the conclusions reached as to the quantity of <br /> water that could be reliably obtained from this <br /> source. <br /> 2) We will work with the County staff to better define <br /> the scheme for financing the capital improvements. <br /> Once a specific proposal is identified, we will <br /> evaluate the feasibility and reliability of <br /> generating the necessary revenues required to <br /> finance the facility. <br /> 2024 WEST MAIN STREET P.O.BOX 2875 • DURHAM.NORTH CAROLINA 27705 • (919)286-5148 <br /> RALEIGH,NC DURHAM,NC • CHARLOTTE,NC NEWPORT NEWS,VA HOLLYWOOD,FL • NEW YORK,NY <br />
The URL can be used to link to this page
Your browser does not support the video tag.