Browse
Search
Agenda - 05-02-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 05-02-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 10:01:37 AM
Creation date
10/3/2016 4:25:05 PM
Metadata
Fields
Template:
BOCC
Date
5/2/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
005 <br /> Clearance <br /> Removal of 1 dilapidated Structure $1 , 500 <br /> from the project area <br /> Water System Improvements <br /> Construction of 2 , 000 l . f of 6" PVC *$61 , 718 <br /> Water Mains <br /> Sewer System Improvements <br /> Construction of 3500 1 . f . of 8" PVC *$270 , 000 <br /> Sewer including installation of a <br /> "Gorman Rump" Pump Station and service <br /> connections <br /> Administration <br /> Ongoing Program Administration $78 , 833 <br /> $684 , 281 <br /> *These cost estimates for water/sewer improvements exceed the <br /> state average CDBG costs. A County contribution of $84 , 281 . 00 <br /> towards the sewer project could reduce the CDBG cost of this <br /> activity. This cost does not include the capital facilities <br /> fees for water and sewer connections which is estimated to be <br /> approximately $27 , 000 . It also does not include the <br /> perpetual maintenance fee of approximately $27 , 000 that the <br /> Town of Hillsborough requires for construction of new sewage <br /> pump stations . <br />
The URL can be used to link to this page
Your browser does not support the video tag.