Orange County NC Website
044 <br /> 11.2.2 Where compensation is based on a stipulated sum or percentage of Construction Cost,progress payments for Basic Services <br /> in each phase shall total the following percentages of the total Basic Compensation payable: <br /> (Insert additional phases as appropriate.) - ) <br /> Schematic Design Phase: • • percent(15%) <br /> Design Development Phase: percent(20%) <br /> • Construction Documents Phase: percer t(40%) .;.... . , . <br /> Bidding or Negotiation Phase: percent( 5%) <br /> Construction Phase: - percent(20%) . <br /> Total Basic Compensation: one hundred percent(100%) <br /> 11.3 COMPENSATION FOR ADDITIONAL SERVICES • <br /> 11.3.1 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES,as described in Paragraph 3.2,compensation shall be com- <br /> puted as follows: <br /> hourly rates as listed below: <br /> Principals Time $60/hour , <br /> Project Architect $40/hour <br /> Interior Design $40/hour <br /> Drafting Technician $25/hour . <br /> Administrative Support $20/hour <br /> 11.3.2 FOR ADD)ITIONAI, SERVICES OF TIIE ARCHITECT, as described in Articles 3 and 12, other than (1) Additional Project <br /> Representation,as described in Paragraph 3.2,and(2)services included in Article 12 as part of Additional Services,but excluding ser- <br /> vices of consultants, compensation shall be computed as follows: <br /> (Insert halls of crmtpensalion, in:'udinR rates aarl/nr multiples of Direct Personnel F_greuse for Principals and employees,and lde•tr((fy Principals and classify <br /> employees, if required.Identify specific services to winch particular methods of compensation apply, if necessary.) <br /> as in 11.3.1 <br /> 11.3.3 FOR ADDITIONAL SERVICES OF CONSULTANTS, including additional structural, mechanical and electrical engineering <br /> services and those provided under Subparagraph 3A.19 or identified in Article 12 as part.of Additional Services, a multiple of <br /> ( 1.1 ) times the amounts billed to the Architect for such services. • <br /> (Identify sprafie Opec of nmsultams in Article 12 if required.) <br /> 11.4 REIMBURSABLE EXPENSES <br /> 11.4.1 FOR REIMBURSABLE EXPENSES,as described in Paragraph 10.2.and any other items included in Article 12 as Reimbursable <br /> Expenses,2 multiple of ( 1 i )times the expenses incurred by the Architect,the Architect's <br /> • employees and consultants in the interest of the Project. . <br /> 11.5 ADDITIONAL PROVISIONS <br /> 11.5.1 IF THE BASIC SERVICES covered by this Agreement have not been completed within <br /> ( •1 )months of the date hereof,through no fault of the Architect,extension of the Architect's services beyond that time shall be <br /> coMpensated as provided in Subparagraphs 10.3.3 and 11.3.2. <br /> 11.5.2 Payments are due and payable ( 30 ) days from the date of the Architect's invoice. <br /> Amounts unpaid ( 30 )days after the invoice date shall bear interest at the rate entered below,or <br /> in the absence thereof at the legal rate prevailing from time to time at the principal place of business of the Architect. <br /> (Insert rate of interest agreed upon.) J <br /> (t/sure laws and requirements under the Federal Teeth in LendinR Art.similar stale and local consumer credit lards and other rvprdations at the rhtmer's and Archt- <br /> ten's principal places of business,the location of the Protect and&sem•h(re mar affect the validity of this provision.Specific legal adrice should be obtained with <br /> respect to deletions or modifications,and also regarding requirements such as written disclosures or weavers.) <br /> AIA DOCUMENT 8141 • OWNER•ARCIIITECT AGREEMENT• FOIIRTEENTII EDITION• AIA• • t019R7 <br /> 9 B141-1987 '►'I IF AMERIt AN INSTiTIITE OF ARCHITECTS.1735 NEW YORK AVENIIE,N.W.,WASHINGTON,D.C.20006 <br />