038 , <br /> 2.6.4 The Architect shall be a representative of and shall advise quantity of the Work.(2)reviewed construction means,meth- <br /> and consult with the Owner(1)during construction until final od5, techniques,sequences or procedures,(3)reviewed copies <br /> payment to the Contractor is due,and(2)as an Additional Ser- •of requisitions received from Subcontractors and material sup- <br /> vice at the Owner's direction from time to time during the cot- pliers and other data requested by the Owner to substantiate <br /> rcction period described in the Contract for Construction.The the Contractor's right to payment or(4)ascertained how or for <br /> Architect shall have authority to act On behalf of the Owner what purpose the Contractor has used money previously paid <br /> only to the extent provided in this Agreement unless otherwise on account of the Contract Sum. <br /> modified by written instrument. 2,6.11 The Architect shall have authority to reject Work which <br /> 2.6.5 The Architect shall visit the site at intervals appropriate dares not conform to the Contract Documents. Whenever the <br /> to the stage Of construction or as otherwise agreed by the Architect considers it necessary or advisable for implementa- <br /> Owner and Architect in writing to become generally familiar [ion of the intent of the Contract Documents,the Architect will <br /> with the progress and quality of the Work completed and to have authority to require additional inspection or testing of the <br /> determine in general if the Work is being performed in a man- Work in accordance with the provisions of the Contact Docu- <br /> ner indicating that the Work when completed will he in accor- meats, whether or not such Work is fabricated, installed or <br /> dance with the Contact Documents. I1owcver, the Architect completed.I lowever,neither this authority of the Architect nor <br /> shall not he required to make exhaustive or continuous on-site a decision made in good faith either to exercise or ndt to exer- <br /> inspections to check the quality or quantity of the Work. On cisc such authority shall give rise to a duty or responsibility of <br /> the basis of on-site observations as an architect, the Architect the Architect to the Contractor, Subcontractors, material and <br /> shall keep the Owner informed of the progress and quality of equipment suppliers, their agents or employees or other per- <br /> the Work, and shall•endeavor to guard the Owner against sons performing portions of the Work. <br /> defects and deficiencies in the Work. Wore extensive site 2.6.12 The Architect shall review and approve or take other <br /> representation iser in rag be agreed to as an Additional service, as appropriate action upon Contractor's submittals such as Shop <br /> described in Yaral;rnpl�3.2.) Drawings, Product Data and Samples, but only for the limited <br /> 2.6.6 The Architect shall not have control over or charge of purpose of checking For conformance with information given <br /> and the design concept expressed in the Contract Documents. <br /> and shall not he responsible for construction means,methods, The Architect's action shall he taken with such reasonable <br /> techniques,sequences or procedures,or for safety precautions rem rtes as to cause no delay in the Work or it the con <br /> and programs in r connection with the under Work, since era these are promptness <br /> of the Owner or of separate contractors,while allow- <br /> Construction.the Contractor's responsibility under the Contact for ing sufficient time in the Architect's professional judgment to <br /> Construction. "i•hc Architect shall not be responsible for the permit adequate review. Review of such submittals is not con- <br /> Contractor 5 schedules or failure to carry out the Work in accor- ducted for the purpose of determining the accuracy and corn- <br /> have with the Contract Documents. The Architect shall not pletencss of other details such as dimensions and quantities or <br /> have control over or charge of acts or omissions of the Cortese- for substantiating instructions for installation or performance of • <br /> other r perso Subcontractors,pu performing i g portions agents f or employees,W or of any equipment or systems designed by the Contractor,all of which •' <br /> other persons performing portions of the Work. remain the responsibility of the Contractor to the extent <br /> 2.6.7 The Architect shall at all times have access to the Work required by the Contract Documents. The Architect's review <br /> wherever it is in preparation or progress. shall not constitute approval of safety precautions or, unless <br /> otherwise specifically stated by the Architect, of construction <br /> 2.6.8 Except as may otherwise he provided in the Contract means, methods, techniques, sequences or procedures. The <br /> Documents or when direct communications have been spc- Architect's approval of a specific item shall not indicate <br /> dally authorized,the Owner and Contractor shall communicate approval of an assembly of which the item is a component. <br /> through the Architect.Communications by and with the Archi- When professional certification of performance characteristics <br /> • tect's consultants shall he through the Architect. of materials,systems or equipment is required by the Contract <br /> Documents,-the Architect shall he entitled to rely upon such <br /> 2.6.9 Based on the Architect's observations and evaluations of certification to establish that the materials, systems or equip- <br /> the Contractor's Applications for Payment, the Architect shall mem will meet the performance criteria required by the Con- <br /> review and certify the amounts due the Contractor- tract Documents. <br /> 2.6.10 The Architect's certification for payment shall consti- 2.6.13 The Architect shall prepare Change Orders and Con- <br /> tute a rcpresentation to the Owner, based on the Architect's struction Change Directives, with supporting documentation <br /> observations at the site as provided in Subparagraph 2.6.5 and. and data if deemed necessary by the Architect as provided in <br /> on the data comprising the Contractor's Application for Pay- Subparagraphs 3.1.1 and 3.3.3,for the Owner's approval and <br /> moot,that the Work has progressed to the point indicated and execution in accordance with the Contract Documents, and <br /> that,to the best of the Architect's knowledge, information and • " may authorize minor changes in the Work not involving an <br /> belief, quality of the Work is in accordance with the Contract adjustment in the Contract Sum or an extension of the Contract <br /> • Documents. The foregoing representations arc subject to an Time which are not inconsistent with the intent of the Contract <br /> _evaluation of the Work for conformance with the Contract Documents. <br /> Documents upon Substantial Completion, to results of subse- <br /> quent tests and inspections,to minor deviations from the Con- 2.6.14 The Architect shall conduct inspections to determine <br /> tract Documents correctable prior to completion and to spe- the date or dates of Substantial Completion and the date of final <br /> cific qualifications expressed by the Architect.The issuance of a completion, shall receive and forward to the Owner for the <br /> Certificate for Payment shall further constitute a representation Owner's review and.records written warranties and related <br /> -- that the Contractor is entitled to payment in tile amount certi- documents required by the Contract Documents and assem- J <br /> fled. However, the issuance of a Certificate for Payment shall bled by the Contractor,and shall issue a final Certificate for Pay- , <br /> not he a representation that the Architect has(1)made cxhaus- mcnt upon compliance with the requirements of the Contract <br /> tive or Continuous on-site inspections to check the quality or Documents. <br /> AIA DOCUMENT BlaI • OWNER-ARCIIITECT AGREEMENT• FOURTEENTH EDITION• MA' • ©19R7 <br /> 3 B141_1967 TI IF.AMERICAN INSTITUTE OF ARCIIITF.CTS,1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.20006 <br />