Orange County NC Website
11.2.2 Where compensation is based on a stipulated sum or percentage of Construction Cost,progress payments for Basic Services <br /> in each phase shall total the following percentages of the total Basic Compensation payable: <br /> (insert additional phases as appropriate.) <br /> ' Schematic Design Phase: - percent(15%) <br /> Design Development Phase: percent(20%) '° <br /> Construction Documents Phase: percent(40%) ,;. • <br /> Bidding or Negotiation Phase: percent( 5%) <br /> Construction Phase: percent(20%) <br /> Total Basic Compensation: one hundred percent(100%) - <br /> 11.3 COMPENSATION FOR ADDITIONAL SERVICES <br /> 11.3.1 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES,as described in Paragraph 3.2,compensation shall be com- <br /> puted as follows: <br /> hourly rates as listed below: <br /> Principals Time $60/hour .. • '-1 <br /> Project Architect $40/hour <br /> Interior Design $40/hour • <br /> Drafting Technician $25/hour <br /> Administrative Support $20/hour <br /> 11.3.2 FOR ADDITIONAL SERViCES OF THE ARCHITECT, as described in Articles 3 and 12, other than (1) Additional Project <br /> Representation,as described in Paragraph 3.2,and(2)services included in Article 12 as part of Additional Services,but excluding ser- <br /> vices of consultants, compensation shall be computed as follows: <br /> (insert basis of compensation, inthttling rates and/or multiples of Direct Personnel Expense for Principals and employees, and identify Principals and classify <br /> employees, if required. identify specific services to which particular methods of compensation apply, if necessary,) <br /> as in 11.3.1 <br /> • <br /> • <br /> 11.3.3 FOR ADDITIONAL SERVICES OF CONSULTANTS, including additional structural, mechanical and electrical engineering <br /> services and those provided under Subparagraph 3.4.19 or identified in Article 12 as part.of Additional Services, a multiple of <br /> ( 1.1 )times the amounts billed to the Architect for such services. <br /> (Identify specific t37,es of consultants in Article 12.if required.) <br /> • <br /> 11.4 REIMBURSABLE EXPENSES <br /> 11.4.1 FOR REIMBURSABLE EXPENSES,as described in Paragraph 10.2,and any other items included in Article 12 as Reimbursable <br /> Expenses,a multiple of ( 1 J. )times the expenses incurred by the Architect,the Architect's <br /> employees and consultants in the interest of the Project. <br /> 11.5 ADDITIONAL PROVISIONS <br /> 11.5.1 IF THE BASIC SERVICES covered by this Agreement have not been completed within <br /> ( )months of the date hereof,thr(nigh no fault of the Architect,extension of the Architect's services beyond that time shall be <br /> _ cothi5ensated as provided in Subparagraphs 10.3.3 and 11.3.2. <br /> 11.5.2 Payments are due and payable ( 30 ) days from the date of the Architect's invoice: <br /> Amounts unpaid ( 30 )days after the invoice date shall bear interest at the rate entered below,or <br /> in the absence thereof at the legal rate prevailing from time to time at the principal place of business of the Architect. . <br /> (insert rate of interest agreed upon.) <br /> ((tcury laws and requirements under the Federal Truth in Lending Act,similar state and local consumer credit laws and other regulations at the Owner's and Archi- <br /> tect s principal places of business, the location of the Protect and elsetc'here may affect the validity of this provision.Specific legal advice should be obtained with <br /> respect to deletions or modifications,and also regarding requirements such as written disclosures or waiters.) <br /> AIA DOCUMENT B141 • OWNER-ARCHITECT AGREEMENT•FOURTEENTH EDITION•AIA• •©1987 <br /> 9 8141-1987 THE AMERICAN INSTITUTE OF ARCHITECTS.1735 NEW YORK AVENUE.N.W.,WASHINGTON.D.C.20006 <br />