Browse
Search
Agenda - 05-02-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 05-02-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 10:01:37 AM
Creation date
10/3/2016 4:25:05 PM
Metadata
Fields
Template:
BOCC
Date
5/2/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWN OF CARRBORO D E C I s G� D <br /> 1988-1989 <br /> TRANSPORTATION IMPROVEMENTS PROGRAM Adopted by Carrboro <br /> PRIMARY Board of Aldermen <br /> 3-22-P.8 130 <br /> 1. Widen NC 54 to a four lane boulevard facility from 15-501 - to the <br /> intersection of NC 54 and Old Fayetteville Road. <br /> This project is currently included in the State TIP as project U-2003. <br /> The Town continues its support of this project. <br /> URBAN <br /> 1. Widen the following streets to 36 feet with curb & gutter and bike lanes: <br /> Hillsborough Street from West Main Street to the Town limits <br /> West Main Street from Hillsborough Street to NC 54 <br /> North Greensboro Street from Estes Drive to Hillsborough Street <br /> This project is currently included in the State TIP as project U-2002. <br /> The Town continues its support of this project. <br /> 2. Widen Estes Drive to three lanes from the Carrboro Town Limits to North <br /> Greensboro Street, and include bike lanes. <br /> 3. Improvement of downtown circulation patterns. Specifics will be included <br /> in Carrboro's long-range downtown circulation report. <br /> 4. Construct a bridge over Morgan Creek on the Old Fayetteville Road <br /> Extension as part of the Laurel Hill Parkway and include sidewalks and <br /> provisions for bicycle travel . <br /> STATE SECONDARY <br /> 1. Widen the bridge on Smith Level Road over Morgan Creek to five lanes and <br /> include sidewalks and provisions for bicycle travel . <br /> This project is currently included in the State TIP as project B-2159. <br /> The Town continues its support of this project. <br /> 2. Widen Smith Level to five lanes from NC 54 to Rock Haven Road, and to <br /> four lanes from Rock Haven Road to US 15-501 <br /> 3. Widen Jones Ferry Road to five lanes from Old Fayetteville Road to NC 54 <br /> TRANSPORTATION SYSTEM MANAGEMENT <br /> 1. Implement the recommendations of the Chapel Hill-Carrboro Signalization <br /> Study to purchase and install improved signal equipment in the two towns. <br /> 2. Installation of an actuated signal with pedestrian controls at the <br /> intersection of Main Street-Weaver Street-Carr Mill Mall-Roberson Street <br /> BICYCLE PROGRAM <br /> 1. Include bike lanes on Estes Drive from the Carrboro Town Limits to North <br /> Greensboro Street, as an incidental project, and coordinate this project <br /> with project listed in State TIP for Estes Drive from Airport Road to <br /> Town Limits in Chapel Hill <br />
The URL can be used to link to this page
Your browser does not support the video tag.