Orange County NC Website
TOWN OF CARRBORO D E C I s G� D <br /> 1988-1989 <br /> TRANSPORTATION IMPROVEMENTS PROGRAM Adopted by Carrboro <br /> PRIMARY Board of Aldermen <br /> 3-22-P.8 130 <br /> 1. Widen NC 54 to a four lane boulevard facility from 15-501 - to the <br /> intersection of NC 54 and Old Fayetteville Road. <br /> This project is currently included in the State TIP as project U-2003. <br /> The Town continues its support of this project. <br /> URBAN <br /> 1. Widen the following streets to 36 feet with curb & gutter and bike lanes: <br /> Hillsborough Street from West Main Street to the Town limits <br /> West Main Street from Hillsborough Street to NC 54 <br /> North Greensboro Street from Estes Drive to Hillsborough Street <br /> This project is currently included in the State TIP as project U-2002. <br /> The Town continues its support of this project. <br /> 2. Widen Estes Drive to three lanes from the Carrboro Town Limits to North <br /> Greensboro Street, and include bike lanes. <br /> 3. Improvement of downtown circulation patterns. Specifics will be included <br /> in Carrboro's long-range downtown circulation report. <br /> 4. Construct a bridge over Morgan Creek on the Old Fayetteville Road <br /> Extension as part of the Laurel Hill Parkway and include sidewalks and <br /> provisions for bicycle travel . <br /> STATE SECONDARY <br /> 1. Widen the bridge on Smith Level Road over Morgan Creek to five lanes and <br /> include sidewalks and provisions for bicycle travel . <br /> This project is currently included in the State TIP as project B-2159. <br /> The Town continues its support of this project. <br /> 2. Widen Smith Level to five lanes from NC 54 to Rock Haven Road, and to <br /> four lanes from Rock Haven Road to US 15-501 <br /> 3. Widen Jones Ferry Road to five lanes from Old Fayetteville Road to NC 54 <br /> TRANSPORTATION SYSTEM MANAGEMENT <br /> 1. Implement the recommendations of the Chapel Hill-Carrboro Signalization <br /> Study to purchase and install improved signal equipment in the two towns. <br /> 2. Installation of an actuated signal with pedestrian controls at the <br /> intersection of Main Street-Weaver Street-Carr Mill Mall-Roberson Street <br /> BICYCLE PROGRAM <br /> 1. Include bike lanes on Estes Drive from the Carrboro Town Limits to North <br /> Greensboro Street, as an incidental project, and coordinate this project <br /> with project listed in State TIP for Estes Drive from Airport Road to <br /> Town Limits in Chapel Hill <br />