Orange County NC Website
PRELIMINARY COST SUMMARY FOR <br /> SEVEN MILE CREEK RESERVOIR <br /> SECOND (final ) STAGE 3.30.88 <br /> Elev. Darr Top: 597.0 FT MSL - / Dam Hgt : 67.00 FT <br /> 20 Yr Safe Yld. (MGD) : 8.0 / Storage: 4,900 MG <br /> ITEM WORK QUANTITY EA TOTAL <br /> 1 . Contractor Mobilization 300,000 <br /> 2. Dam Site Preparation 214 ,8B2 <br /> 3. Da S Spillway Const. 63,583 CY a $30 490 1 4 7 <br /> > 0 , <br /> 4. Diversion Conduit 0 FT n) $1 ,304 <br /> 0 <br /> 5. Intake Tower 219,895 <br /> 6. Access Roads 4,400 FT a $15 66,000 <br /> 7. Miscellaneous Site Work 200,000 <br /> B. Electrical 25,000 <br /> 9. Reservoir Clearing 420 AC @ $1 ,700 816,000 <br /> 10. Property Acquisition <br /> a. Max . Flood Pool 440 AC a $2,500 1 , 100,000 <br /> b. Wildlife Mitigation 500 AC a $500 250,000 <br /> c. Impacted Structures <br /> o. Poss. Impacted Structures 0 <br /> 187,200 <br /> 11 . Road Relocations/Modifications <br /> 1 ,000,000 <br /> 12. Modifications to Existing Utilities <br /> 0 <br /> Subtotal 6,286,467 <br /> Eng. and Contingencies a 30% 1 ,885,940 <br /> TOTAL BUDGET COST $8, 172,407 <br /> COST/GALLON YIELD <br /> $1 .02 <br /> COST/GALLON YIELD (net ) 51 . 18 <br /> (acj . for instream flow required: 1 . 10 MGD) <br />