Orange County NC Website
PRELIMINARY COST SUMMARY FOR <br /> SEVEN MILE CREEK RESERVOIR <br /> FIRST STAGE 3.30.88 <br /> Elev. Dam Top: 570.0 FT MSL / Dam Hgt : 60.00 FT <br /> 20 Yr Safe Yld. (MGD) : 3.0 / Storage: 1 , 100 MG <br /> ITEM WDRK QUANTITY EA TOTAL <br /> 1 . Contractor Mobilization 300,000 <br /> 2. Dam Site Preparation 270,984 <br /> 3. Darr, E Spillway Const . 64,374 CY 7 $30 1 ,931 ,220 <br /> 4. Diversion Conduit 150 FT 8 $1 ,304 195,600 <br /> 5. Intake Tower 659,699 <br /> 6. Access Roads 4 ,400 FT 8 $30 132,000 <br /> 7. Miscellaneous Site Work 280,000 <br /> B. Electrical <br /> 75,000 <br /> 9. Reservoir Clearing 270 AC 8 $1 ,700 459,000 <br /> 10. Property Acquisition <br /> a. Max. Flood Pool 220 AC 8 $2,500 550,000 <br /> b. Wildlife Mitigation 200 AC 8 $500 100,000 <br /> C . Impacted Structures <br /> d. Pcss. Impacted Structures 0 <br /> 0 <br /> 11 . Road Relocations/Modifications <br /> 0 <br /> 12. Modifications to Exi=ting Utilities 0 <br /> Subtotal 4,953,503 <br /> Eng. and Contingencies n) 30% 1 ,486,051 <br /> IOTA, BUDGET COST $6,439,554 <br /> COST/GALLON YIELD $2. 14 <br /> COST/GALLON YIELD (net) 52.56 <br /> �� (adj . for instream flow required: 0.50 MGD) <br />