Orange County NC Website
• <br /> PRELIMINARY COST SUMMARY FOR <br /> SEVEN MILE CREEK RESERVOIR <br /> SINGLEE PROJECT 3.30.88 <br /> Elev. Lam Top: 597.0 FT MSL / Dam Mgt: 87.00 FT <br /> 20 Yr Safe Yld. (MGD) : 8.0 / Storage: 4,900 MG <br /> ITEM WORK QUANTITY EA TOTAL <br /> 1 . Contractor Mobilization 300,000 <br /> 2. Dam Site Preparation 391 ,000 <br /> 3. Dam & Spillway Const. 110,737 CY 830 3,322, 110 <br /> Diversion Conduit 150 FT a 51 ,304 195,600 <br /> f. Intake Tower 800,000 <br /> 6. Access Roads 4,400 FT a $75 330,000 <br /> 7. Miscellaneous Site Work 480,000 <br /> 8. Electrical 100,000 <br /> 9. Reservoir Clearing 750 AC a 31 ,700 1 ,275,000 <br /> 10. Property Acquisition <br /> a. Max . Flood Pool 660 AC a 32,500 1 ,650,000 <br /> b. Wildlife Mitigation 700 AC a $500 350,000 <br /> c. Impacted Structures 0 <br /> d. Poss. Impacted Structures 167,200 <br /> 11 . Rad Relocations/Modifications 1 ,000,000 <br /> 12. Modifications to Existing Utilities <br /> 0 <br /> Subtotal 10,300,910 <br /> Eng. and Contingencies a 30% 3, 114 ,273 <br /> TOTAL BUDGET COST 513,495, 183 <br /> COST/GALLON YIELD 81 .69 <br /> COST/GALLON YIELD (net) $1 .96 <br /> (adj . for instream flow required: 1 . 10 MGD) <br /> NOTES: ITEM NO. <br /> 10.a. Maximum Flood Pool includes all land inundated minus <br /> 100 acres of land already owned by the county. <br /> 10.b. Wildlife Mitigation includes replacement acres for <br /> all land inundated (normal pool ) by acquiring <br /> Duke Forest easements. <br />