Orange County NC Website
5 <br /> Stages One and Two <br /> Town 60.3% <br /> County 39.7% <br /> e. The preliminary cost summaries were prepared based upon the use of <br /> construction methods proven to be of superior quality and feasibility. The <br /> dam is to be constructed of roller-compacted concrete (RCC) , an innovative <br /> construction technique recommended for water control projects , and one <br /> which makes it economically feasible to construct the project in phases. <br /> f. The Town further proposes, as part of the joint undertaking for <br /> the Reservoir Project, that the Town and the County cooperate in seeking <br /> all available sources of financial assistance and participation from state <br /> and/or federal programs in support of recreational and water supply/utility <br /> projects. <br /> Section 2. This resolution shall be effective upon adoption. <br /> Adopted this the 31st day of March , 1988. <br /> TOWN OF HILLSBOROUGH <br /> , Ov l J 1" , <br /> 41111177 S. a es , Jr. , Mayo I Allen Ll 'yd, Commissioner <br /> if <br /> Remus Smith, Commissioner Horace H. Jchnso P Commissioner(ij-C7 1111â– Bobby Rile , Commissioner J. Michael Kirby, Commission <br />