Browse
Search
Agenda - 04-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 04-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 9:49:07 AM
Creation date
10/3/2016 3:23:38 PM
Metadata
Fields
Template:
BOCC
Date
4/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY COST SUMMARY FOR <br /> SEVEN MILE CREEK RESERVOIR <br /> TOTAL, ALL STAGES 3.30.88 <br /> Elev. Dam Top: 597.0 FT MSL / Dam Hgt: 87.00 FT <br /> 20 Yr Safe Yld. (MGD) : 8.0 / Storage: 4,900 MG <br /> ITEM WORK QUANTITY EA TOTAL <br /> 1 . Contractor Mobilization 600,000 <br /> 2. Dam Site Preparation 485,866 <br /> 3. Dam & Spillway Const. 3,838,710 <br /> 4. Diversion Conduit 195,600 <br /> 5. Intake Tower 879,594 <br /> 6. Access Roads 198,000 <br /> 7. Miscellaneous Site Work 480,000 <br /> 8. Electrical 100,000 <br /> 9. Reservoir Clearing 1 ,275,000 <br /> 10. Property Acquisition <br /> a. Max. Flood Pool 1 ,650,000 <br /> b. Wildlife Mitigation 350,000 <br /> c. Impacted Structures 0 <br /> d. Poss. Impacted Structures 187,200 <br /> 11 . Road Relocations/Modifications 1 ,000,000 <br /> 12. Modifications to Existing Utilities 0 <br /> Subtotal 11 ,239,970 <br /> Eng. and Contingencies a 30% 3,371 ,991 <br /> TOTAL BUDGET COST $14,611 ,961 <br /> COST/GALLON YIELD $1 .83 <br /> COST/GALLON YIELD $2. 12 <br /> (adj . for instream flow required: 1 . 10 MOD) <br />
The URL can be used to link to this page
Your browser does not support the video tag.