Orange County NC Website
PRELIMINARY COST SUMMARY FOR <br /> SEVEN MILE CREEK RESERVOIR <br /> Hazen/Sawyer Estimate <br /> Elev. Dam Top: 596.0 FT MSL " / Dam Height: 74.00 FT <br /> 20 Yr Safe Yld. (MGD) : 6.00 / Storage: 2,070 MG <br /> ITEM WORK TOTAL <br /> 1 . Contractor Mobilization 231 ,381 <br /> 2. Dam Site Preparation 894,900 <br /> 3. Dam Embankment 2,424,250 <br /> 4. Principal Spillway 3,489,500 <br /> 5. Diversion Conduit 446,500 <br /> 6. Intake Tower 1, 156,400 <br /> 7. Access Roads 345,000 <br /> B. Miscellaneous Site Work 540,000 <br /> 9. Electrical 100,000 <br /> 10. Reservoir Clearing 370,000 <br /> 11 . Property Acquisition 1 ,462,200 <br /> 12. Road Relocations/Modifications 930,000 <br /> 13. Modifications to Existing Utilities 0 <br /> Subtotal 12,390,131 <br /> Eng . and Contingencies a 30/. 3,717,039 <br /> TOTAL BUDGET COST $1$, 107, 170 <br /> COST/GALLON YIELD $2.68=. <br /> COST/GALLON YIELD $3.29 <br /> (adj . for instream flow required: 1 .10 MGD) <br />