Orange County NC Website
• <br /> 164 <br /> between the lines constructed to serve each water cus- <br /> tomer ( water meter ) and the main lines or lateral <br /> lines constituting the extension of the Town ' s system <br /> before construction of the extension begins . The <br /> amount of the fees for each phase are based on the <br /> number of residential units which will ultimately be <br /> served by that phase of water and sewer extension <br /> construction. The capital facilities fees shall be <br /> paid by the individual or entity requesting service , <br /> whether the County or its successors in interest . <br /> C. Construction Conditions: <br /> 1 . Unless otherwise provided in this contract , all con- <br /> struction shall be in accordance with Town policy, <br /> standards and specifications . <br /> a) The Town shall designate the size and type of <br /> material for all water and sewer lines . <br /> b) All work shall be subject to inspection by the <br /> Town. No line may be covered up until such in- <br /> spection has taken place and if any line or <br /> facility is covered up prior to inspection, the <br /> Town may require such line or facility to be un- <br /> covered or exposed to view at the developer' s ex- <br /> pense to facilitate such inspection. <br /> c ) The Town may require any testing it deems ap- <br /> propriate to determine that the work complies with <br /> 6 <br />