Browse
Search
Agenda - 04-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 04-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 9:49:07 AM
Creation date
10/3/2016 3:23:38 PM
Metadata
Fields
Template:
BOCC
Date
4/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15:5 specific to the Project described above and any change or alteration in <br /> the approved plans of such project shall, absent the written consent of <br /> the Town, void this contract. <br /> 10. The words "line' or "lines" shall include "main" or "mains" unless the <br /> contract otherwise requires. "Sewer" means "sanitary sewer."hall b cnstrued in <br /> 11. This contract shall be of North Carolina. aAllslitigationo <br /> accordance with the law o arising out <br /> of this contract shall be brought in courts sitting in North Carolina. <br /> B. Pre-Construction Conditions <br /> 1. - The Developer shall engif registered <br /> for the professional construction engineer <br /> water <br /> prepare plans and spec <br /> improvements and/or sanitary sewer improvements to serve the Project. <br /> 2. The Developer shall secure approval of the construction plans by the <br /> following agencies or authorities, to the extent applicable: <br /> the Town <br /> the North Carolina Department of Human Resources <br /> the North Carolina Department of Natural Resources <br /> and Community Development <br /> the North Carolina Department of Transportation <br /> 3. The Developer shall obtain any necessary encroachment agree.nents or <br /> easements for use of property not owned by the undersigned developer or <br /> project owner. <br /> 4. All water and sewer capital facilities fees for residential <br /> projects shall be paid before construction of the extension <br /> begins. Where water and sewer extensions covered by this contract <br /> are to be constructed in phases, the capital facilities fees for <br /> - each phase must be paid before construction begins on that phase. <br /> The amount of the fees for each phase are based on the number of <br /> residential units which will ultimately be served by that phase of <br /> water and sewer extension construction. <br /> C. Construction C:nditions: <br /> 1. Unless otherwise provided in this contract, all construction shall be <br /> in accordance with Town policy, standards and specifications. <br /> a) The Town shall designate the size and type of material for all <br /> water and sewer lines. <br /> b) All work shall be subject to inspection by the Town. No line may <br /> be covered up until such inspection has taken place and if any <br /> line or facility is covered up prior to inspection, the Town may <br /> require such line or facility to be uncovered or exposed to view <br /> at the developer' s expense to facilitate such inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.