Browse
Search
Agenda - 04-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 04-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 9:49:07 AM
Creation date
10/3/2016 3:23:38 PM
Metadata
Fields
Template:
BOCC
Date
4/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
153 <br /> (3) The Developer agrees to comply with or satisfy the following terms and <br /> e <br /> conditions as well as those set <br /> the Appendix Town9 ss systerntlis <br /> Town's authorization to co nnect <br /> specifically contingent upon compliance with or satisfaction of the same. <br /> A. General Conditions: <br /> 1. Unless otherwise explicitly and specifically stated, Developer shall <br /> bear the costs and expenses of all of the obligations and duties <br /> created by this contract, including without limitation,, engineering and <br /> legal fees incurred by the Town in connection with the proposed exten- <br /> sion- <br /> 2. The Town will permit the physical connection of the extension to the <br /> Town' s Sections water or and C ds any addit onal conditions conditions set <br /> have <br /> in Sections B and G <br /> been satisfied. <br /> 3. The Town shall maintain the improvements constructed under this <br /> contract after they are dedicated. However, if within one year of the <br /> date that the offer of dedication of the extension constructed pursuant <br /> to this contract is accepted, defects in workmanship or materials are <br /> discovered in work done pursuant to this contract by or for the <br /> Developer, the Developer shall see that such defects are promptly <br /> corrected at the Developer's expense. <br /> any <br /> 4. The Town may make or authorize extensions o <br /> connections <br /> onto act fromliout <br /> of the improvements constructed pursuant <br /> permission of the Developer. <br /> 5. Developer's construction f ofmthe obligation ston this <br /> shall not relieve Developer <br /> under the Town' s water and sewer policies. <br /> 6. Developer's construction of improvements pursuant to this contract does <br /> not affect the Town ' s policy with respect to fees t) be paid to the <br /> Town by property owners other than Developer for connection to or <br /> extension of improv.rents constructed by Developer pursuant tfeto th i s <br /> contract. Flor shall Developer have any right <br /> persons connecting onto or extending the improvP1ments constructed <br /> under this contract. <br /> 7. The Town does not warrant that any particular quality, quantity or <br /> pressure of water shall be applicable to serve the Project. <br /> 8. All fees and charges be paid pursuant to this contract shall be <br /> calculated in accordance with the fee schedule in effect when <br /> payment is made. <br /> 9. This contract may be assigned by the Developer, but such successor or <br /> assignee shall obtain no rights hereunder until after it has provided <br /> the Town with a written acknowledgement of its obligations and <br /> responsibilities under this agreement. However, this contract is <br />
The URL can be used to link to this page
Your browser does not support the video tag.