Orange County NC Website
148 <br /> SCOPE OF SERVICES FOR SEVEN MILE CREEK STUDY AREA <br /> (Please refer to enclosure A) <br /> Task 1 Aerial photography cost included in <br /> Corporation Lake cost proposal. This <br /> includes flying the entire study area. <br /> $ 640 <br /> Task 2 Aerial photography cost included in <br /> Corporation Lake cost proposal. This <br /> includes flying the construction area <br /> (dam) . <br /> Task 3 Perform all field surveying work necessary <br /> for the preparation of the topographic maps <br /> described under Tasks 1 and 2 . Erect four <br /> (4) monuments, two on each bank, in the <br /> vicinity of the potential dam site indicated <br /> in Enclosure A. <br /> $ 5,600 <br /> Task 4 Prepare 1" = 200-scale topographic maps with <br /> 5-foot contours for the area described in <br /> Task 1. <br /> $ 8, 128 <br /> Task 5 Prepare 1" = 100-scale topographic maps <br /> with 2-foot contours for the area described <br /> in Task 2 . <br /> $ 3, 160 <br /> Task 6 Convert data from Tasks 1 thru 5 into digital <br /> form for use with the County/Hazen and Sawyer <br /> AutoCAD system. <br /> $ 1, 980 <br /> Task 7 Develop a state-area-volume relationship for <br /> the entire reservoir study area or portion <br /> thereof to be described at a later date. <br /> $ 1,880 <br /> TOTAL $ 20,748 <br />