Browse
Search
Agenda - 04-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 04-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 9:49:07 AM
Creation date
10/3/2016 3:23:38 PM
Metadata
Fields
Template:
BOCC
Date
4/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
148 <br /> Scope of Services for Corporation Lake Study Area <br /> (Please refer to enclosures A and B) Proposed Cost <br /> Task 1 Perform all necessary aerial photography $ 740 <br /> for the preparation of 1"=200' scale <br /> topographic maps with 5—foot contours <br /> of the entire reservoir study area <br /> delineated on Enclosures A and B. The study <br /> area is generally bounded by contour 620. <br /> Lake Orange Dam forms the northern boundary <br /> limit and US 70 the southern limit. <br /> Task 2 Perform all necessary aerial photography $ 1 ,100 <br /> for the preparation of 1" . 100' scale <br /> topographic maps with 2—foot contours of <br /> the poten ial construction area delineated <br /> on Enclosure A. This area is bounded on <br /> the north by the AT&T (buried) telephone <br /> cable, on the east by NC Grid Coordinate <br /> E 1 ,960,000, on the south by US 70, and <br /> on the west by a line running parallel to <br /> and 100 feet west of, an existing road <br /> known as Lloyd's Dairy Road. <br /> Task 3 Perform all field surveying work necessary $ 5,600 <br /> for the preparation of the topographic <br /> maps described under Tasks 1 and 2. <br /> Erect four (4) monuments, two on each <br /> bank, in the vicinity of the potential <br /> dam site indicated in Enclosure A. <br /> Task 4 Prepare 1"=200' scale topographic maps $10,160 <br /> with 5—foot contours for the area <br /> described in Task 1 . <br /> Task 5 Prepare 1" a 100' scale topographic maps $ 3,300 <br /> with 2—foot contours for the area described <br /> in Task 2. <br /> Task 6 Convert data from Tasks 1-5 into digital $ 2,210 <br /> form for use with the County/Hazen and <br /> Sawyer AutoCAD system. <br /> Task 7 Develop a stage—area—volume relationship $ 1 ,920 <br /> for the entire reservoir study area or <br /> portion thereof to be described at a <br /> later date. <br /> Total $25,.430 <br />
The URL can be used to link to this page
Your browser does not support the video tag.