Browse
Search
Agenda - 03-15-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 03-15-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 9:38:23 AM
Creation date
10/3/2016 3:06:08 PM
Metadata
Fields
Template:
BOCC
Date
3/15/1988
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A - • <br /> 094 <br /> Ms. Emily Crudup <br /> January 19, 1988 <br /> Page Four <br /> 4. Chestnut Oaks Cluster Subdivision <br /> • Tnis proposes project would oe located upstream of (WASA's Stone Quarry <br /> Reservoir and if improperly developed, could adversely affect the <br /> quality of that supply. <br /> • OWASA staff recommends that Lots 5, 6, 7, 8, 24, 25, 26 and 27 be moved <br /> to within the 1P—acre open space area adjacent to Jo Mac Road. This <br /> will provide further protection of the steeper sloped areas along the <br /> intermittent streams and will provioe aoditional buffer area for the <br /> assimilation of pollutant runoff from the development. <br /> • Locations for the recommended sanitary sewer easements are: along the <br /> intermittent streams identified on the plat. <br /> • It appears that some of the proposed lots and roadways will be located on <br /> some steeply'sloped areas of the site; therefore, significant <br /> sedimentation and erosion can occur if effective sedimentation and <br /> erosion control measures are not implemented in a timely manner and <br /> permanently maintained. Consideration should be given to the benefits <br /> of constructing a stormwaater/pollutant management facility, such as a <br /> small wet pond, on the intermittent stream downstream of the project. . <br /> Thank you very much for your consideration of the above comments. Please do <br /> not hesitate to contact me if you have any questions relative to OW SA's <br /> position on the proposed project. <br /> Sin ly, <br /> r .\ 1; ' <br /> Patrick K. Davis <br /> Assistant to the Executive Director <br /> wp - <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.