Orange County NC Website
075 <br /> Ms. Emily Crudup <br /> January 19, 1988 <br /> Page Four <br /> 4. Chestnut Oaks Cluster Subdivision <br /> • This proposed project would be located upstream of OWASA s Stone <br /> Reservoir and if improperly quarry <br /> quality of that supply.pperly developed, could adversely affect the <br /> • CWASA staff recommends that Lots 5, 6, 7, 8, 24, 25, 26 and 27 be moved <br /> to within the 10—acre open space area adjacent to Jo Mac Road. This <br /> will provide further protection of the steeper sloped areas along the <br /> intermittent streams and will provide additional buffer area for the <br /> assimilation of pollutant runoff from the development. <br /> • Locations for the recommended sanitary sewer easements are: along the <br /> intermittent streams identified on the plat. <br /> • It appears that some of the proposed lots and roadways will be located on <br /> some steeply sloped areas of the site; therefore, significant <br /> sedimentation and erosion can occur if effective sedimentation and <br /> erosion control measures are not implemented in a timely manner and <br /> permanently maintained. Consideration should be given to the benefits <br /> of constructing a stormwater/pollutant management facility, such as a <br /> small wet pond, on the intermittent stream downstream of the project. <br /> Thank you very much for your consideration of the above comments. Please do <br /> not hesitate to contact me if you have any questions relative to QIASA's <br /> position on the proposed project. <br /> Sinc ly, <br /> 6(:t k)r--)/e <br /> Patrick K. Davis <br /> Assistant to the Executive Director <br /> wp <br />