Orange County NC Website
049 <br /> Master Plan for School Facilities Pais, 18 <br /> GENERAL NEEDS <br /> In all otthe district's schools, there are six common needs which have <br /> been grouped separately for this report: (1) Attention should be given to <br /> replacing inefficient HVAC systems or instituting other energy <br /> conservation measures; (2) the district will, in all likelihood, need to <br /> remove all asbestos containing materials over the next five years from all <br /> buildings; (3) additional efforts need to be made to make our school <br /> facilities accessible to the handicapped; (4) most kitchens need some <br /> upgrading of space and equipment; (5) the district should continue <br /> expending approximately $150,000 per year on major roof replacements; <br /> and (6) much of the carpeting in the district is at the end of its useful life <br /> and is in need of replacement. The costs, which at this time are very <br /> general estimates, for each of these projects is itemized below: <br /> Energy Conservation Measures/Upgrade HVAC Systems $ 750,000. <br /> Asbestos Removal 300,000. <br /> Accessibility for the Handicapped 250,000. <br /> Upgrade Kitchen Facilities and Equipment 150,000. <br /> Major Roof Replacements ($150,000 per year) 750,000. <br /> Major Carpet Replacements 750,000. <br /> TOTAL $2,950,000. <br /> It should be noted that no funds have been earmarked for renovation or <br /> expansion of the Lincoln Center facility, even though the BEP does provide <br /> for increased staffing. Once needs become-clearer, it may be necessary to <br /> request additional funds for this purpose. <br />