041. <br /> On the other hand, as state statutes permit, we did negotiate with the apparent <br /> low bidder to identify potential areas for cost savings. From this review, $90,998 worth <br /> of deducts were identified, reducing the low bid to $1,222,877. To this figure we have <br /> added a 3 percent contingency to provide for unforeseen change orders in the project. <br /> The total cost of the project is $1,259,563. Subtracting the $774,180 of budgeted funds <br /> for this project, leaves a shortfall of $485,383. We are requesting that these funds be <br /> transferred from three projects previously approved by the County Commissioners. <br /> Originally, four capital projects were scheduled for 1988-89: (1) CHHS Cafeteria <br /> Expansion/Renovations; (2) CHHS Media Center Renovation; (3) Can-bore/Estes <br /> Hills/Glenwood Media Center Expansion; and (4) Kitchen Renovations. On February 16, <br /> 1988 the Commissioners approved the transfer of funds from two of these projects to <br /> construct a four-classroom "pod" at Culbreth Junior High School. The $485,363 which we <br /> are requesting would be transferred from projects as outlined below: <br /> Project. 1988-89 Transfers for Transfers to <br /> Budget. ulbreth Project HYAC Projects Balance <br /> CHHS Cafeteria 250,000 250,000 - 0 <br /> CHHS Media Center 235,000 120,000 225,000 0 <br /> Elem Media Centers 225,000 145,383 222 0 17 <br /> 79,6 <br /> Kitchen Renovations 225,000 - _ (20.000)17 <br /> Architect/Engineer (20.000) - <br /> TOTALS $915,000 $370,000 $485,383 $59,617 <br /> As we prepared our Five-Year Capital improvement Plan this year, we folded all of <br /> the 1988-89 projects into the Five-Year Plan (see attachments). The need for each <br /> project remains; however, the school district's priorities and long-range plans have been <br /> revised dramatically since the 1985-86 - 1988-89 Long Range Capital Budget was <br /> prepared. <br /> The previous capital budget was recommended at a time when the school districts <br /> enrollment had been declining for several years. Consequently, additional classroom <br /> space was not envisioned as a priority. Instead, the focus was on improving the quality <br /> of space as evidenced by the air-conditioning projects and expansion and renovation of <br /> support areas. <br /> Today, the picture is vastly different. Elementary enrollments are up by 460 <br /> students over the last four years. This trend is projected to continue. Coupled with <br /> these burgeoning enrollments, the State Board of Education approved a Basic Education <br /> Program in 1984 which required reductions in class size through 1993. Consequently, in <br /> Chapel Hill-Carrboro, we are pressured by both increasing enrollments and new BEP <br />