Browse
Search
Agenda - 02-22-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 02-22-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 4:07:24 PM
Creation date
10/3/2016 2:48:10 PM
Metadata
Fields
Template:
BOCC
Date
2/22/1988
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 22, 1988 <br /> Orange County Board of Commissioners <br /> Dear Commissioners, <br /> I am writing this letter as a concerned property owner <br /> who lives along the Eno River . I have read the initial Parks <br /> and Recreation Master Plan document at the library, attended <br /> the first Public Hearing, and attended the local Cheeks <br /> Township meeting . Although I support the Park proposals of <br /> the plan I cannot support the priority of the swimming pools <br /> having learned of their estimated cost per pool . <br /> I also cannot support the Greenway System in its revised <br /> form. Realizing that it is no ones intention on either the <br /> present Board of Commissioners, or Parks and Recreation <br /> department to pressure a land owner to participate, I find it <br /> troubling that language cannot be included in the document to <br /> protect a landowner of their right to decline to participate . <br /> I find it troubling that 96 linker- miles have been proposed <br /> of which no one has assesed or surveyed its suitibility . I <br /> find it troubling that these same 96 miles are your principle <br /> water scource and wildlife corridors in the county. I find <br /> it troubling that no assesment has been made as to how it <br /> will impact rescue, fire and surely law enforcement needs and <br /> costs to the county. Simply, a commitment by the County of <br /> such scope needs to be based on more than a concept . It needs <br /> to be based on concepts coupled with acheivable goals and <br /> realistic data. <br /> Thank you, <br /> Doug and Mars a Efland <br />
The URL can be used to link to this page
Your browser does not support the video tag.