Orange County NC Website
092 <br /> 2 and 3 rather than another location. Kirk <br /> stated that the Health Department had indicated <br /> to him that between any lots up to lot 5 would <br /> be suitable. Beyond lot 5, there could be a <br /> problem with lot lines crossing approved <br /> septic tank sites. <br /> Best asked why Staff felt a marginal access <br /> street was not needed. Kirk responded that the <br /> traffic count did not warrant a marginal access <br /> street and the subdivision is to have shared <br /> driveways. <br /> MOTION: Yuhasz moved approval with Staff conditions. <br /> Seconded by Lewis. <br /> VOTE: Unanimous. <br /> 2. SHADOW LAKE ( CLUSTER) <br /> ( 101 LOTS - ENO TOWNSHIP) <br /> Presentation by Emily Crudup. <br /> The 155. 1 acre tract is located in Eno Township <br /> on the east side of Pleasant Green Road ( SR <br /> 1567 ) north of Willet Road ( SR 1568) . The <br /> property is zoned Residential -1 , and the Land <br /> Use Plan designation is Agricultural <br /> Residential . Adjacent land uses include Eno <br /> River State Park , Duke Power and Piedmont <br /> Electric rights-of-way, Greenwood Subdivision, <br /> and other residential lots. <br /> The applicant proposes 101 lots in three phases <br /> served by public roads and by common <br /> nitrification fields for septic tank disposal . <br /> The average lot size is 1 . 09 acres, and the <br /> minimum lot size is 33, 000 square feet (0.76 <br /> acre) . The remaining 32. 17 acres will be <br /> preserved in open space. The nitrification <br /> fields ( 18. 34 acres) will be owned and main- <br /> tained by a qualified utility company. A <br /> homeowners association will be responsible for <br /> the remainder of the open space ( 13.73 acres) , <br /> including two proposed ponds. The majority of <br /> the tract -boundary is bordered by a 20-foot <br /> conservation easement. <br /> All agencies have reviewed the preliminary plan <br /> for Shadow Lake. Permits for construction of <br /> the sewage -disposal system must be approved by <br /> the N. C. Division of Environmental Management <br /> prior to final plat approval . <br /> The N. C. Department of Transportation had the <br /> following comments : <br /> 1 . A 100-foot right turn lane and a 150-foot <br /> taper is recommended along SR 1567 due to <br />