Orange County NC Website
8 <br /> subcommittees to be formed would be on water and impact fees. <br /> Commissioner Hartwell expressed a concern that the issue of water <br /> needs to be addressed right away and not given to a subcommittee for <br /> deliberation. <br /> After further discussion, the general consensus of the Board was <br /> to support the concept of an intergovernmental committee but to address <br /> the topic of water as a separate issue and on a more immediate timeline. <br /> 3. CAPITAL REQUEST FROM CHAPEL HILL-CARRBORO SCHOOLS <br /> Interim Finance Director Ken Chavious presented a request from <br /> Chapel Hill-Carrboro School system for capital funding for construction of <br /> four classrooms at Culbreth Junior High and the purchase of four mobile <br /> classrooms. The total cost would be $350,000. Two funding mechanisms <br /> were detailed by Chavious. <br /> Motion was made by Commissioner Willhoit, seconded by Commissioner <br /> Hartwell to approve the request for capital funding of two major capital <br /> projects with the funding to be provided from the reallocation of funds <br /> previously approved in the school capital Long Range Plan for Fiscal Year <br /> 1988-89. <br /> VOTE: UNANIMOUS. <br /> 4 . PETITION FOR ADDITION OF STREETS IN WILDWOOD SUBDIVISION, SECTIONS <br /> ONE AND TWO, TO THE STATE-MAINTAINED SECONDARY ROAD SYSTEM <br /> Motion was made by Commissioner Hartwell, seconded by Commissioner <br /> Willhoit to approve the petition from NCDOT for the addition of Judah <br /> Benjamin Court, Wade Hampton Road, Braxton Bragg Court, Joseph Johnston <br /> Court, John Breckinridge Drive, Charlie Tew Court, George Anderson Drive, <br /> and Walter Clark Drive in Wildwood Subdivision, Sections One and Two, to <br /> the state-maintained secondary road system. <br /> VOTE: UNANIMOUS. <br /> 5. DARK HILLS - PRELIMINARY <br /> Planning Director Marvin Collins presented a Preliminary Plan for <br /> Dark Hills Subdivision. This plan was previously considered by the Board <br /> and, because of additional information, was referred back to the Planning <br /> Board. The property is located in Cedar Grove Township on Carr Store <br /> Road. Thirteen (13) lots are proposed out of 136.25 acres. The Planning <br /> Board and the Administration recommends approval with two conditions. <br /> Motion was made by Commissioner Willhoit, seconded by Commissioner <br /> Hartwell to approve the preliminary plan with two conditions: <br /> (1) That the proposed 60-foot access road be relocated as placed <br /> between lots .2 and 3; and <br /> (2) That common driveways be provided for lots 1-12. <br /> VOTE: UNANIMOUS. <br /> 6. PINE FOREST II - PRELIMINARY <br /> The property is located on Pleasant Green Road in Eno Township. A <br /> private Class C road is proposed to serve two proposed lots. The property <br /> is designated Agricultural Residential in the Orange County Land Use Plan <br /> and zoned the same on the Zoning Atlas. The Planning Board and the <br /> Administration recommends approval with one condition. <br /> Motion was made by Commissioner Carey, seconded by Chair Marshall <br /> to approve the preliminary plan for Pine Forest II with the condition that <br /> lot #1 receive access from the private road. <br /> VOTE: UNANIMOUS. <br /> 7. CHESTNUT OAKS - PRELIMINARY PLAN <br /> The property is located near the Bingham/Chapel Hill Township line <br /> on the west side of Jo Mac Road. Thirty-one (31) lots are proposed out of <br />