Orange County NC Website
1� <br /> ih <br /> ti <br /> Page I of 3 <br /> WORK FLAN PROJECTS HILLSBOROUGH AND ENO TOWNSHIPS PLAN OBJECTIVE NO. I DATE: 12-3-8? <br /> O B J E CTIVE TO DEVELOP A LAND USE PLAN AHENDFIENT FOR SECTIONS 3.9 AND 3.10 (HILLSBOROUGH AND ENO TOWNSHIPS) OF THE ORANGE COUNTY LAND USE PLAN WHICH <br /> INCORPORATES THE. 1983 CENTRAL ORANGE AREA STUDY AND THE 1986 PANTRY AREA STUDY AND WHICH CAN BE INTEGRATED SMOOTHLY INTO THE OVERALL <br /> LAND USE PLAN UPDATE FOR TILE cauttrY. <br /> TASK ACTIVITY STAff J F M A M J 1 A S O IJ D <br /> ASSIG HIHi _ _ <br /> DELINEATE BOUNDARY OF STUDY AREA (IN Prepare W-1000' Township base map. Interne <br /> ADDITION TO TOWNSHIPS, STUDY AREA ALSO <br /> INCLUDES THAT PORTION OF CHAPEL HILL Secure from Town of Hillsborough, a map <br /> TOWNSHIP NORTH OF RURAL. BUFFER). showing location of all existing/proposed Planner III <br /> annexations since 1981 AL <br /> IDENTIFY EXISTING AND POTENTIAL PUBLIC Compile data on public-safety facilities <br /> SERVICES AND INFRASTRUCTURE. and road systems to include classifica�- Planner Ii Q <br /> tionr.. design capacities, and volume <br /> Secure map of existing/proposed limits Planner III . <br /> of Eno River State Park. <br /> Secure from Town of Hillsborough, a map <br /> showing location of all existing/proposed Planner II Q <br /> water/sewer lines outside the town's <br /> extraterritorial jurisdiction. <br /> IDENTIFY EXISTING SOCIOLeGICAL Compile data on existing-and projected Planner It . <br /> CHARAc:TFRISTTCS population. <br /> Map existing land uses and density of Planner II <br /> development; compute acreage in various 6 L, <br /> land use categories. Interns <br /> IDENTIFY ENVIRONMENTAL CONSTRAINTS AND Identify most restrictive/permissive Planner III . <br /> OPPORTUNITIES FOR DEVELOPMENT. environmental features for development: <br /> ♦ Map location of environmental features. Interns <br /> Prepare composite map showing most Interns . <br /> suitable areas for development. <br /> ACTIVITY SYJA8015* A ACTIVITIES TO BE COMPIETED AT A SPECIFIC FUIIIRE DATE. ■ ACTIVITY COMPLETED, ■E-- A ACIIVIIY COMPLETED AHEAD OF SCIIEDULE . <br /> A I1v ncI horn Tn finer rr)mpfiin11 nATF <br />