Orange County NC Website
A <br /> 013 <br /> Page Two ;::, : -- <br /> C. Provision of Tanker For Temporary Pump and Haul of Wastewater: <br /> Labor (2 employees, @ $17.50/crew-hour) $ 17.50/hour <br /> Equipment - 28.00/hour <br /> Over-the-road-tractor/tanker ($21/hour) <br /> Portable pump ($3/hour) <br /> Pick-up service truck ($4/hour) <br /> Total Direct Costs 45.50/hour <br /> Indirect Costs (1.29 x Labor costs) 22.60/hour <br /> TOTAL COST: $ 68.10/hour * <br /> * NOTE: This service will be on an "as-needed" basis. The hourly charge <br /> would begin at the time OWASA personnel and equipment depart <br /> from ONASA to the Efland pumping station and continue until the <br /> return to OWASA headquarters. The overtime multiplier for labor <br /> is 1.5. <br /> D. Corrective Maintenance to Remove Blockage In Gravity Sewer: <br /> Labor (2 employees, @ $16.70/crew-hour) $ 16.70/hour <br /> Equipment 29.00/hour <br /> Pick-up service truck ($4/hour) <br /> Vactor- High Pressure Sewer Hodder ($25/hour) <br /> Total Direct Costs 45.70/hour <br /> Indirect Costs (1.29 x Labor costs) 21.55/hour <br /> TOTAL COST $ 67.25/hour * <br /> * NOTE: This service will be provided on an "as-needed" basis. The <br /> hourly charge will begin at the time the °NASA personnel and <br /> equipment depart from °NASA to the Efland sewer problem and <br /> continue until the return to OWASA headquarters. The <br /> overtime multiplier for labor is 1.5. <br />