Orange County NC Website
ORANGE WATER AND SEER AUTHORITY <br /> PROPOSED LABOR AND EQUIPMENT RATES APPLICABLE TO THE PROVISION OF <br /> muNTEJANCE SERVICES FUR EFiAND/CHEEKS SEWER SYSTEM <br /> (Revised Draft- January 12, 1988) <br /> The labor, equipment and overhead rates quoted below are those in effect as of <br /> January 1, 1988. These rates are subject to. revision to reflect the rates in <br /> effect at the time of execution of the agreement and annually thereafter. <br /> A. Operation and Maintenance of McGowan Creek Pump Station: <br /> Labor (1 emp3oyee, 3 hours, @ $10.25/hour),.. <br /> Equipment (3 hours @ $4/hour) $ 30.75 <br /> Materials and supplies 12.00 <br /> 0 <br /> Total Direct Costs ,-. 75 <br /> Indirect Costs (1.29 x Labor costs) 35.70 <br /> 39.70 <br /> TOTAL COST PER VISIT: <br /> $ 85.45 <br /> NOTE: It is recommended that this Service be provided at a frequency <br /> of at least 3 visits per week. OWASP, inspects its pumping <br /> stations on a daily basis. <br /> B. Corrective Maintenance Services at McGowan Creek Pump Station: <br /> Labor (2 employees, 4 hours each, @ $16.70/crew-hour) $ 66.80 <br /> Equipment (4 hours @ $4/hour) <br /> Materials and supplies *** 16.00 <br /> Required *** <br /> Total Direct Costs <br /> Indirect Costs (1.29 x Labor costs) 86.20 <br /> 86.20 <br /> TOTAL COST: <br /> $169.00 <br /> * NOTE: This service will be on an "as-needed" basis. Additional costs <br /> will result if more than 4 hours are required to correct the <br /> problem which caused the alarm condition or if this work would <br /> be done at the overtime rate for labor, which is 1.5 times the <br /> normal labor rate. Note that materials and supplies costs are <br /> not included. <br />