Browse
Search
Agenda - 02-01-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 02-01-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 4:03:59 PM
Creation date
10/3/2016 12:30:51 PM
Metadata
Fields
Template:
BOCC
Date
2/1/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
094' <br /> all proposel ingress and Qgres_s, J�.cations aLl <br /> internal roadway widths and rights-of-way . <br /> parking conditions„ trgfficchannelizations, and <br /> ti any traffic signals or other intersection <br /> control devices at all intersections within the <br /> site. <br /> • The report shall describe the entire external <br /> roadway system within the study area. Major <br /> intersections - Jn the study area shall be <br /> ,I_SI ent i f i ed ._pan sketched , .. ._.All ei..s. <br /> x t iiig . and <br /> proposed public transportation services and <br /> faciJ itiea within one-mile of the site shall <br /> glso be documented. Future highway <br /> t t <br /> Carolina ' s Transportation Improvement Program. <br /> Any proposed roadway_ improverpgIlts due to <br /> proposed surrounding deyelopmehts shall also be <br /> noted. <br /> c) Ex1UIlNG TRAFFIC CQNDITIONS <br /> Existing_ <br /> And _docgmented fir a_11 roadways and <br /> intersections in the <br /> traffic yolgmes for_Aygrage daily traffic . peak <br /> t i <br /> geh hg recorded. <br /> courts at,ma jor _i.nt.QLsac± i ons i n <br /> the study area shall be condj .t. d . encompassing <br /> the peak highway and development-generated, <br /> hour( s) . aj i be _Iuci uded _i R <br /> the report, A vo Ila.ni /capac.j ty anal ys ig based <br /> formed during <br /> peak <br /> development-gengra 1 . . . . , . <br /> and major _infgrsectlon s IL the study area. <br /> L.Q/gla of service shall be term i ned for each <br /> location . <br /> IhiL analysis wiiJ determine the adegppcy of the <br /> $ erye the current <br /> traffic demand. Roadways end/or intersections <br /> experlencing levels of service E or F shall be <br /> notegi as congestion loQatioCs- <br /> d ) TRANSPORTATJON EMPACT OF THE DEVELOPM.NT <br /> Lslima_t ion _ _veh.iQJljAr trips to result from the <br /> groposa I sha l I_ be comp) eted for the average <br /> dally�sak hi4hl��y <br /> hour(s) and peak development <br /> ggnerated hour(1) . _ Yeh i cu lar trip generation <br />
The URL can be used to link to this page
Your browser does not support the video tag.