Browse
Search
Agenda - 02-01-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 02-01-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 4:03:59 PM
Creation date
10/3/2016 12:30:51 PM
Metadata
Fields
Template:
BOCC
Date
2/1/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule A <br /> February 12, 1988 <br /> Page Two <br /> C. Provision of Tanker For Te rar Pump and Haul of Wastewater: <br /> Labor (2 employees, @ 17.50/crew-hour) $ 17.50/hour <br /> Equipment 28.00/hour <br /> Over-the-road tractor/tanker ($21/hour) <br /> Portable Pump ($3/hour) <br /> Pick-up service truck ($4/hour) <br /> Total Direct Costs 45.50/hour <br /> Indirect Costs (1.29 x Labor costs) 22.60/hour <br /> TOTAL COST: 60.10/hour * <br /> * NOTE: This service will be on an "as-needed" basis. The hourly charge <br /> would begin at the time OWASA personnel and equipment depart <br /> from OWASA to the Efland pumping station and continue until the <br /> return to OWASA headquarters. The overtime multiplier for labor <br /> is 1.5. <br /> D. Corrective Maintenance to Remove Blocka.es In Gravit Sewer: <br /> La..r 2 emp oyees, 16.70/crew hour) 16.70/hour <br /> Equipment 29.00/hour <br /> Pick-up service truck ($4/hour) <br /> Vector- High Pressure Sewer Hodder ($25/hour) <br /> Total Direct Costs 45.70/hour <br /> Indirect Costs (1.29 x Labor costs) - 21.55/hour <br /> TOTAL COSTT $ 67.25/hour * <br /> * NOTE: This service will be provided on an "as-needed" basis. The <br /> hourly charge will begin at the time OWASA personnel and <br /> equipment depart from OWASA to the Efland sewer problem and <br /> continue until the return to OWASA headquarters. The <br /> overtime multiplier for labor is 1.5. <br /> E. General Maintenance <br /> Services supplemental to those listed above shall be billed at the <br /> applicable hourly rate for personnel, vehicles, and equipment. An <br /> indirect cost multiplier of 1.29 will be applied to all labor. Materials <br /> will be billed at inventory cost plus 10%. <br /> -2A- <br />
The URL can be used to link to this page
Your browser does not support the video tag.