Orange County NC Website
lir <br /> SCHEDULE A <br /> ORANGE WATER AND SEWER AUTHORITY <br /> PROPOSED LABOR AND EQUIPMENT RATES APPLICABLE TO THE PROVISION OF <br /> MAINTENANCE SERVICES FOR EFtAN D/CHEEKS SEWER SYSTEM <br /> (February 12, 1988) <br /> The labor, equipment, and overhead rates quoted below are those in effect as <br /> of January 1, 1988. The rates billed to Orange County are subject to revision <br /> to reflect the rates in effect at the time services are provided. Actual <br /> charges due shall be based on the wage rates and rental charges applicable to <br /> the personnel and equipment used by OWASA. <br /> A. Operation and Maintenance of McGowen Creek Pump Station: <br /> Labor (1 employee, 3 hours, @$10.25/hour) <br /> Equipment (3 hours @ $4/hour) $ 30.75 <br /> Materials and supplies 12.00 <br /> Total Direct Costs 3.00 <br /> Indirect Costs (1.29 x Labor costs) 45 75 <br /> 39.70 <br /> TOTAL COST PER VISIT: <br /> 85.45 * <br /> * NOTE: It is recommended that this service be provided at a frequency <br /> of at least 3 visits per week. OWASA inspects its pumping <br /> stations on a daily basis. <br /> B. Corrective Maintenance Services at McGowen Creek Pum• Station: <br /> La••r (2 employees, 4 hours each, @ 16.70 crew hour) 66.80 <br /> Equipment (4 hours @ $4/hour) <br /> Materials and Supplies *** 16.00 <br /> As Required *** <br /> Total Direct Costs <br /> Indirect Costs (1.29 x Labor costs) 86.20 <br /> 86.20 <br /> TOTAL COST: <br /> 169.00 <br /> * NOTE: This service will be on an "as-needed" basis. Additional costs <br /> will result if more than 4 hours are required to correct the <br /> problem which caused the alarm condition or if this work would <br /> be done at the overtime rate for labor, which is 1.5 times the <br /> normal labor rate. Note that materials and supplies costs are <br /> not included. <br /> -1A- <br />