Orange County NC Website
PRELIMINARY PRICE QUOTATION 0.12 <br /> Option Dmrintion Kimball Piedmont <br /> 1 1" . 200' scale, 2-foot contour maps of <br /> entire area <br /> Total Cost: $36,500 $38,000 <br /> 2 a) 1" . 200' scale, 5-foot contour maps <br /> of entire area $17,940 $20,000 <br /> b) Aerial and field work for preparation <br /> of 1' .100' scale, 2-foot contour <br /> maps of dam construction area $ 5,410 $ 6,600 <br /> c) Preparation of topo maps described <br /> under (b) above $ 2,100 $ 2,920 <br /> Total Cost: $25,450 $29,520 <br /> 3 Additional cost for conversion of data <br /> for use with County and/or Hazen and Sawyer <br /> CAD system, if required $ 2,000 $ 7,000 <br /> *($1 ,000) <br /> 4 Develop stage-storage relation for <br /> reservoir, if required -- $ 1 ,000± <br /> A formal request for bids will be submitted to Kimball and Piedmont <br /> following the receipt of authorization from the Orange County Board of <br /> Commissioners. <br /> *Dam construction area only <br /> 1 <br />