Browse
Search
Agenda - 01-19-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 01-19-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 3:22:01 PM
Creation date
10/3/2016 11:30:38 AM
Metadata
Fields
Template:
BOCC
Date
1/19/1988
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
060 DRAFT <br /> ATTACHMENT #1 <br /> ORANGE WATER AND SEWER AUTHORITY <br /> PROPOSED LABOR AND EQUIPMENT RATES APPLICABLE TO THE PROVISION OF <br /> MAINTENANCE SERVICES FOR EFIANWCHEEKS SEWER SYSTEM <br /> (Revised Draft- January 12, 1988) <br /> The labor, equipment and overhead rates quoted below are those in effect as of <br /> January 1, 1988. These rates are subject to revision to reflect the rates in <br /> effect at the time of execution of the agreement and annually thereafter. <br /> A. Operation and Maintenance of McGowan Creek Pump Station: <br /> Labor (1 employee, 3 hours, @ $10.25/hour) $ 30.75 <br /> Equipment (3 hours @ $4/hour) 12.00 <br /> Materials and supplies 3.00 <br /> Total Direct Costs 45.75 <br /> Indirect Costs (1.29 x Labor costs) 39.70 <br /> TOTAL COST PER VISIT: $ 85.45 <br /> NOTE: It is recommended that this service be provided at a frequency <br /> of at least 3 visits per week. OWASA inspects its pumping <br /> stations on a daily basis. <br /> B. Corrective Maintenance Services at McGowan Creek Pump Station: <br /> Labor (2 employees, 4 hours each, @ $16.70/crew-hour) $ 66.80 <br /> Equipment (4 hours @ $4/hour) • 16.00 <br /> Materials and supplies *** As Required *** <br /> Total Direct Costs 82.80 <br /> Indirect Costs (1.29 x Labor costs) 86.20 <br /> TOTAL COST: $169.00 * <br /> * NOTE: This service will be on an "as-needed" basis. Additional costs <br /> will result if more than 4 hours are required to correct the <br /> problem which caused the alarm condition or if this work would <br /> be done at the overtime rate for labor, which is 1.5 times the <br /> normal labor rate. Note that materials and supplies costs are <br /> not included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.