Orange County NC Website
ARTICLE 6 - APPLICATION OF DIMENSIONAL REQUIREMENTS (continued). <br /> Planning Staff Planning Board <br /> Ordinance Requirements +Findings Evidence Submitted to Support Findings Findings <br /> Article 6.23 <br /> Lists extra requirements for <br /> Protected Watershbd Districts (PW-II ) <br /> V <br /> 6.23.1 Stream buffers required Yes No Not applicable. Streams on property Yew No <br /> along perennial streams are intermittent, not perennial . <br /> Drainage easements will be required. <br /> 6.23.4 Impervious surface X Yes No Impervious surface areas are listed Yes No <br /> Regulated in Protected Watersheds for each lot on the plan. Road surfaces <br /> Maximum allowed impervious surface have been included. The total proposed <br /> is 12% of each lot area. impervious surface for the project is 11 .91%. <br /> Site plans for each lot will be required <br /> prior to issuance of building permits. <br /> 6.23.5 The minimum residential X Yes No Limited suitable sites for septic tank Yes No <br /> lot size shall be determined by disposal prompted the proposal of an <br /> the wastewater treatment system alternate system for treatment of waste <br /> applicable. water. Lot sizes exceed the 2-acre minimum <br /> established as part of the Rural Buffer. <br /> 6.23.7 Within the Protected Water- Yes X No A stormwater management plan will be Yes No <br /> shed It district the first one-half required. <br /> inch (I") of runoff from all <br /> impervious surfaces in new develop- <br /> ments shall be controlled. <br /> 6.23.8 Within Protected Watershed Yes X No An erosion control plan will be required. Yes No <br /> II districts, a minimum of the amount Site plans for each lot required for <br /> of undisturbed area necessary to meet building permits with designated areas <br /> impervious surface requirements to remain undisturbed. <br /> provided in 6.24.4 shall remain <br /> undisturbed during the construction <br /> process. <br />