Browse
Search
Agenda - 01-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 01-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 3:19:42 PM
Creation date
10/3/2016 11:25:11 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
004,- 2 <br /> to NCDOT standards. NCDOT has reviewed the plan and <br /> recommended the following: <br /> 1 . Property lines are to follow the sight triangles at <br /> Bowden Road ( SR 1946 ) . <br /> 2. A proposed island at the entrance to the development <br /> must be maintained by a homeowners association. <br /> Additional right-of-way must be dedicated to <br /> accommodate a six-foot wide shoulder and a ditchline <br /> with 2: 1 slopes. <br /> 3. A sight easement must be provided at the intersection <br /> of George Poe Road and McLennan ' s Farm Road. <br /> 4. Lots 8, 9, 10 and 11 must have driveways off George Poe <br /> Road. <br /> 5. If McLennan ' s Farm Road is extended, the cul -de-sac <br /> right-of-way must revert to the adjoining property <br /> owners. <br /> Both the South Orange Rescue Squad and the White Cross <br /> Volunteer Fire Department have indicated their ability to <br /> serve the proposed development. The Sheriff ' s Department has <br /> indicated that the development will result in an additional <br /> 12.3 manhours needed for responding to service calls. While <br /> the Sheriff ' s Department will be able to handle such <br /> service, the demand, combined with other developments, could <br /> cause the need for additional manpower. <br /> The Erosion Control Officer has indicated that a stormwater <br /> management plan is required for the project. Grading permits <br /> will also be required prior to the start of construction. <br /> Comments from Orange Water & Sewer Authority and the Town of <br /> Carrboro have been received. The comments as well as the <br /> Planning Staff response has been provided as attachments. <br /> RECOMMENDATION: The Planning Staff recommends approval of the request with <br /> conditions. ( See attachment. ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.