Orange County NC Website
., <br /> SYSTEMS DESIGN 035 <br /> CONSI DERATIONS <br /> i Once the design engineer has made where as gravity lines must be <br /> a decision to design a pressure aligned in a continuous down- <br /> i sewer system, he must then decide ward slope. Deep cuts for gravity <br /> on design parameters that would lines become quite expensive, <br /> 9 effect the operation of the system. especially where rock and high <br /> The most important considerations water tables are present. <br /> would be design flow, friction loss, C. Narrow and Shallow Trenches - <br />' pump.type, scouring velocity and Pressure sewer service lines and <br /> air venting. force mains can be easily installed <br /> in narrow trenches just below the <br /> frost line. in the case of the <br /> Friction losses are determined by Sunbelt states, the pipe has to be <br />' the Hazin-Williams method with laid deep enough for mechanical <br /> appropriate C factor. A C factor of protection. <br /> 150 is used most frequently in STEP D. Minimum Equipment & Labor - <br /> pressure sewer designs. A scouring Pressure sewers can be installed <br /> velocity of 2 to 5 f/sec. is normally with a trencher and backhoe. The <br /> recommended for the service lines force mains usually are installed <br /> and force mains. However, since a in the right-of-ways along the road. <br /> high percentage of solids and grease In comparison, gravity sewer in- <br /> is left in the septic tank. some en- stallations require large power <br /> gineers use a minimum scouring shovels and it may be necessary <br /> velocity of 1 f/sec. Air venting is to install the mains in the streets. <br /> important to prevent binding at the Labor and equipment require- <br /> high points of the pressure mains. ments to handle large diameter <br /> gravity sewer pipe in comparison <br /> There is a limit to how many homes to small PVC pipe can be substar•.- <br /> can be paralleled together in one Rally higher. <br /> system depending on pump head E. Small diameter Bridge p Crossings - <br /> capabilities and the TDH require- Smac diameter pressure sewer <br /> ments of the system. About 500 can lines and pressure mains <br /> homes would be the upper limit with can be bored under roads with <br /> relatively flat topography, minimum difficulty (assuming no <br /> rock)since precise slope and align- <br /> ment are not critical. Small force <br /> ADVANTAGES OF EFFLUENT mains can be installed across <br /> PRESSURE SEWERS bridges without the use of pump <br /> VERSUS GRAVITY - stations. If freezing is of concern. <br /> the small pipe can be insulated <br /> A.Small Diameter Plastic Pipe-One within limitations. <br /> Of the advantages of pressure F. Reduction or Elimination of Pump <br /> of the over ntaglty systems is pressure Stations and Manholes - Another <br /> ability wens over <br /> use small diameter advantage of pressure sewers is <br /> plastic the ability to eliminate manholes <br /> pipe for the service lines and pumping stations within limit- <br /> and force mains. In pressure ations of the grinder pumps head <br /> systems,the service line is normal- capabilities. Manholes are not <br /> ly 1.W' l.b. and 1-%" to 6" I.D. required with <br /> - for force mains. This is in-corn- However, vre bsure sewers. <br /> owever. a valve box is recpm- <br /> parisort to gravity service lines of - mended about every 1000 feet or <br /> 4 smelt"and gravity mains up to <br /> major <br /> 74" and 16" for a comparable change in direction. if inter- <br /> . - number of house Connections, mediate pump stations are re- <br /> um Consequently, there is e a ma or pulsed in a pressure sewer system, <br /> cost advantage in the piping col- they are usually much smaller <br /> lection system for pressure sewers pompand vents. s due to lower <br /> flow r ee <br /> versus gravity. <br /> quirements. <br /> B.Pipe Alignment - Based on the G.Infiltration & Inflow - One of the <br /> pumping capability of the pump. major problems with gravity sewers <br /> the service lines and force mains is the problem of heavy indltleaky <br /> can run up and downhill following � due to broken pipe and leaky �� <br /> the contour and downhill <br /> shutoff following joints.In the flooding seasons this <br /> treat- <br /> limitations) of the topography can cause problems at the treat- <br /> _ _ _ 4 <br /> CRAIG S.MORGAN AND ASSOCI�ATES,P.A.• i <br />