Browse
Search
Agenda - 01-04-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 01-04-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 3:19:42 PM
Creation date
10/3/2016 11:25:11 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1988
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s - -- <br /> 034 <br /> • <br /> EFFLUENT PUMPING For maximum corrosion resistance. <br /> EQUIPMENT FOR the discharge piping, junction box <br /> PRESSURE SEWERS and shutoff valve are made of plastic <br /> materials. Mercury ball level controls <br /> In grinder pump pressure sewer are standard.Some engineers speci- <br /> • systems there has been only one size fy a redundant check valve to be lo- <br /> centrifugal grinder pump (2 hp) avail- cared in service line for added <br /> • able for installation at the individual protection. An anti-siphoning valve <br /> home. However, in a STEP pressure is added to the internal piping if low <br /> sewer, the engineer can choose from heads or negative heads (downhill <br /> a a variety of horsepowers and sizes. runs) are expected to prevent any <br /> STEP pumps can be 1/3, .4, 1/2, 1, siphoning action. In most cases, the <br /> 1-1/2 and 2 hp, depending on the cover is made of steel so that it can <br /> head and flow requirements. The per- withstand the weight of a riding lawn <br /> formance, weight, and cost of the mower. Pump basin covers are nor- <br /> ) STEP pumps increase as horse- mally installed flush with the ground <br /> power increases. The STEP pumps level. An anti-flotation flange held <br /> that are available are basically sump by concrete is provided to prevent <br /> pumps, small hp sewage ejectors or the basin from moving upward in <br /> . modifications thereof. , highwater table areas. <br /> 1 <br /> One of the drawbacks of currently <br /> 1 available STEP pumps is that they <br /> generate much higher flows than PERFORMANCE <br /> needed. As an example, a 1/2 hp <br /> $ STEP pump can generate up to 80 Since STEP pumps are pumping a <br /> gpm with shut off heads to 78 feet. clarified liquid from a septic tank, <br /> 4 Since the peak wastewater flow there is usually very little problem <br /> generated from an average individual with the pump plugging.The risk of <br /> home is no more than 8-15 gpm, you plugging is greater if an old septic <br /> can see that the flow rates are much tank is used which is generating <br /> higher than needed. The high flow heavy flows and possibly some carry <br /> i rates make it more difficult to hydrau- over solids due to infiltration. <br /> lically design a pressure sewer and <br /> will increase pipe sizes. In addition, .At one time, it was assumed that <br /> the high flow rates of the standard a high percentage of old septic tanks <br /> effluent pumps can create problems could be utilized as part of a STEP <br /> 4 when discharging into a variable pressure sewer. Now, the consensus <br /> gravity sewer system. of opinion is that the majority of old <br />$ septic tanks should be replaced <br /> Septic tanks can be made of fiber- with new ones. One of the problems <br /> in using old septic tanks is the clues- <br />) glass,polyethylene or concrete. Con- tion of how do you determine if the <br /> crete is the most readily available. tank is leaking. By the time you <br /> 4 The most common size used is 1000 pump out the septic tanks, find the <br /> gallons.although 500 and 750 gallon leak and repair it (assuming this can <br /> 9' size tanks have been used in some be accomplished), it may be less <br /> pressure systems. In commercial expensive to put in a new septic tank. <br /> applications,larger size septic tanks - <br /> i will be required. Two potential problems associated <br /> Variations of an audio and visual with STEP systems are corrosion <br /> l alarms are used, although the Most and odors. As previously indicated. <br /> - . corrosion can be overcome by <br /> 1 flashing popular <br /> aln m I st-ht <br /> emounted ion con- - choice of materials. Since the septic <br /> trol panel. Most all control panels tank is vented through the house <br /> with a disconnect switch are located plumbing system, no outside venting <br /> is required. Care must be taken to <br /> outside so they will be easily acces- . insure the Cover to the wet well is <br /> - sible to the serviceman. The prefer- sealed properly. Odors can be a <br /> able location of the panel and alarm problem at intermediate pump sta- <br /> is on the side of the home or garage tions if vented to atmosphere. This <br /> to minimize aesthetic concerns of <br /> the home owner. If desired, the can solved g installing an under- <br /> groo <br /> panel can be located at the septic ground venting system. <br /> - tank/pump basin and mounted on a <br /> pedestal. <br /> _CRAIG S.MORGAN AND ASSOCIATES,P.A.- 3 Al <br />
The URL can be used to link to this page
Your browser does not support the video tag.